1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Brilliant_brown [7]
3 years ago
10

Need some help with this question.

Mathematics
1 answer:
Sergio [31]3 years ago
7 0
The expected value would be 12 as it has the highest P(outcome).
You might be interested in
An environmentalist wants to find out the fraction of oil tankers that have spills each month.Step 1 of 2:Suppose a sample of 47
torisob [31]

Answer: The proportion of oil tankers that had spills is \dfrac{156}{474} or 0.329.

Step-by-step explanation:

Since we have given that

Number of tankers is drawn = 474

Number of tankers did not have spills = 318

Number of tankers have spills = 474 - 318 = 156

Proportion of oil tankers that had spills is given by

\dfrac{Containing\ spill}{Total}=\dfrac{156}{474}=0.329

Hence, the proportion of oil tankers that had spills is \dfrac{156}{474} or 0.329.

3 0
3 years ago
Please help! How would you find the relative frequency of being female and attending an action movie?
denpristay [2]
Is this a STARR test? 
A. Divide 99 by 250
6 0
3 years ago
Read 2 more answers
Determine 2 additional fractions that would reduce to one fourth?
Len [333]

Answer:

2/8, 4,16

Step-by-step explanation:

6 0
3 years ago
The function f(x)=600+2x over x yields the average cost in dollars for a company to produce x calendars. Which statement best fi
nevsk [136]

Answer:

The correct option is a.

Step-by-step explanation:

The average cost function is

f(x)=\frac{600+2x}{x}

Where x is the number of calendars produced.

The average cost formula is

AC=\frac{\text{Total Cost}}{\text{Number of items}}

Therefore the total cost is defined b the function

g(x)=600+2x

Here 600 is the initial cost and the cost each unit is 2.

Initial cost is the fixed cost which occurs at zero level of productivity.

The company spends $600 on a new computer and printer before beginning the project. The option (a) is correct.

8 0
3 years ago
Read 2 more answers
What are the first ten multiples of 12
iris [78.8K]
12x1
12x2
12x3
12x4
12x5
12x6
12x7
12x8
12x9
12x10
4 0
3 years ago
Read 2 more answers
Other questions:
  • The perimeter of a rectangle is 48 in. If the length is twice the width, what is the length of the rectangle? A. 64 in. B. 16 in
    7·2 answers
  • In a right triangle, the side opposite a 33 degree angle is 17 units. What is the length of the side adjacent to that angle to t
    8·1 answer
  • To join the gym there is a $100 annual fee and a $7 monthly fee for each class you attend. What is the total cost to be a member
    9·1 answer
  • Can someone please help me with the B part? <3
    9·1 answer
  • Letters in the word mathematics
    14·1 answer
  • Find the volume of the composite solid. ft3 pls help!! ::)))):):):):):):)
    12·2 answers
  • The cost, in dollars, to produce 1 watt of solar energy is a function of the number of years
    9·1 answer
  • What is the sum?<br> 2 + (-4) =
    15·2 answers
  • Weary of the low turnout in student elections, a college administration decides to choose an SRS of three students to form an ad
    10·1 answer
  • A ball of radius 14 has a round hole of radius 4 drilled through its center.
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!