Answer:
12.6
Step-by-step explanation:
To find the area of a cylinder, you find the area of the circular base and multiply it by the height. Remember that the area of a circle is pi*r^2. R, the radius, is 2. Putting this into a calculator and rounding to the nearest tenth, you get 12.6. Now that we have the circle, we multiply by the height. Since the height is 1, we have our answer of 12.6.
A is the mid point ==> AL = AB = 2AB
6x-17=2(2x+3) => 6x -17 = 4x +6 => 2x = 23 =>x=23/2
then just plug x into LB and AB
In order to find the answer you will have too divide 58 by 18 and then divide what you get from that by 100 to get your answer.
100%/x%=58/18
(100/x)*x=(58/18)*x
100=3.22222222222*x
(3.22222222222) to get x
100/3.22222222222=x
x=31.0344827586
Therefore your answer is "31%."
Hope this helps.
Answer:
Standard deviation measures Total risk while beta measures Systematic risk.
Step-by-step explanation:
The total risk is the total variability of the portfolio and includes the systematic risk and the unique risk.
The systematic risk is measured by the beta coefficient and it considers the no diversified risk such as changes in the global market. Unique risks are the ones that result from factors specifically related to the company.
I’d say option 4
However, one may think option 3 might be possible as well. But that it is not interacting, it’s affecting.
So I’d stick with option 4.
Good luck!