Answer:
9.3
Step-by-step explanation:
last week she worked 45.6 hours. since 40 hours is the limit for normal working hours, she worked 45.6-40 = 5.6 hours overtime.
this week she worked 9.7+8.3+8+9.1+8.6 hours = 43.7 hours.
she worked therefore 43.7-40 = 3.7 hours overtime.
so, in total of the two weeks, she worked 5.6+3.7 = 9.3 hours overtime.
Answer:
D
the square root of 1000 is 31.6227766017
Step-by-step explanation:
BRANIEST
Answer:
Read step by step explanation
Step-by-step explanation:
The owner already knows that the limit for the average time delivered pizzas is 38 minutes. So we conclude
1.-The resulting mean from sample data ( x ) ( 27 customers) need to be smaller than 38 minutes, any value of sample above 38 minutes means more time for the delivery action and will indicate a failure for the future project
2.-As sample size is smaller than 30 the test has to be t-student one tail test to the left
Test hypothesis
Null hypothesis H₀ x = 38
Alternative hypothesis Hₐ x < 38
We should test at a significance level α = 0,05 (α = 5%)
If the result of the test is to accept H₀ delivery project won´t be implemented, if on the other hand, H₀ is rejected then in the condition of the alternative hypothesis we accept Hₐ the sample indicates that we have a smaller average time than 38 minutes.
Answer:
12.96 ft ³
Step-by-step explanation:
Answer:
The measure of the largest angle in the kite is 128 degrees
Step-by-step explanation:
we know that
The sum of the interior angles in any quadrilateral must be equal to 360 degrees
A kite is a quadrilateral
Let
A,B,C and D the measure of the interior angles
so

we have that

substitute

----> equation A
Remember that
one is four times larger than the other
so
----> equation B
substitute equation B in equation A

solve for D

Find the measure of angle C

therefore
The measure of the largest angle in the kite is 128 degrees