Answer:
y = 8
Step-by-step explanation:
11y + 4y + 60 = 180
11y + 4y = 120
15y = 120
y = 8
To determine the number of days that an employee work in a week, we simply use dimensional analysis and multiplying the number of works per week with the number of weeks in total for a year. That is,
employee works = (5 days per week)(49 weeks per year)
=245 days
Answer:
6.3
Step-by-step explanation:
Two sides are 9.6 meters long. The perimeter is 31.8 meters.
31.8-9.6-9.6=12.6 the remaining two sides.
12.6/2=6.3 represents the lengths of the other twp sides.
Answer:
<u>2x⁵ + x⁴ - x³ + 6x² + 3x - 3</u>
Step-by-step explanation:
Given :
- f(x) = x³ + 3
- g(x) = 2x² + x - 1
Finding (f × g)(x) :
- f(x) × g(x)
- (x³ + 3)(2x² + x - 1)
- 2x⁵ + 6x² + x⁴ + 3x - x³ - 3
- <u>2x⁵ + x⁴ - x³ + 6x² + 3x - 3</u>