Answer:
12/5hours=2.4 hours
Step-by-step explanation:
Sam:6hours
Tom:4hours
This is a rate problem
Sam's rate is one job completed in 6 hours which is 1/6
Tom's rate is one job completed in 4 hours which is 1/4
Together, they could complete 1/4+1/6 of the job in y hours
We are trying to find the rate at which Sam and Tom could complete the job together, or one job in x days, for a rate of 1/y
1/4+1/6=1/y
The least common denominator is 12y
Multiplying through by the LCD which gives:
12y(1/4)+ 12y (1/6)= 12y (1/y)
3y + 2y=12
5y = 12
y=12/5 hours=2.4hours
Therefore it will take 12/5 hours or 2.4 hours to complete the job if they work together
Answer:
y > 1/2x - 1
First, draw the dashed line y = 1/2x - 1 (slope intercept ; y = mx + b).
Start at -1 on the y-axis, and continue going 2 units to the right, and 1 unit up for the right side of the graph.
Then starting at -1 on the y-axis, continue going 2 units to the left, and 1 unit down for the left side of the graph.
Explanation:
Convert standard form (Ax + By = C) by isolating y from the rest of the equation.
Ax + By = C → y = -Ax/B + C/B → y = mx + b.
Given a standard form equation in inequality form,
x - 2y < 2.
Set it to slope-intercept as an inequality to find the slope and y-intercept.
When negating (making opposite) a variable, you flip the inequality.
x - 2y < 2 → x - 2y - x < 2 - x → -2y < -x + 2 → 2y > x - 2 → <u>y > 1/2x - 1</u><u>.</u>
Answer:
z<1.5
Step-by-step explanation:
It is a rectangular pyramid
should i explain?
fell free to tell me if it doesn't make sense :)
Answer:
100
Step-by-step explanation:
both the percentage and the money have the same number, and there's always 100% so it'd be 100 before the tip