1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
sergeinik [125]
2 years ago
14

4. Algebra If in one year a city

Mathematics
1 answer:
vredina [299]2 years ago
7 0

Answer:

268.25

Step-by-step explanation:

by using the fact that one year is 365.25 days, we can subtract our 365.25 by our 97 to get 268.25, written in the equation of 365.25-97=268.25

*edit, messed up how long a year was, corrected my issue, answer & equation.

You might be interested in
What is an equivalent ratio to 5/6
Evgen [1.6K]
Just times everything by something
examples
 10/12
20/24
8 0
2 years ago
4<br>Fill in the blanks to complete the following number patterns.<br>13, 18,___, 31, 39, 49​
ella [17]

Answer:

So you first count how much times the numbers go up,then you add the number you get it is 6+ you add them with 13 and you get 19.

Step-by-step explanation:

So you first count how much times the numbers go up,then you add the numbers so 1 is not enough 2 is not enough 3 is not enough 4 is not enough 5 is not enough 6 is enough, so we add the six with the number that we are adding which is 13,then you get 19

7 0
3 years ago
(-3; -3) and (8-3). What is the slope​
pentagon [3]

Answer:

Step-by-step explanation:

(-3,-3) ; (8,-3)

Slope=\frac{y_{2}-y_{1}}{x_{2}-x_{1}}\\\\=\frac{-3-[-3]}{8-[-3]}\\\\=\frac{-3+3}{8+3}\\\\=0

Slope = 0. so, the line is parallel to x-axis

6 0
3 years ago
Solve: 7.85 + q ≤ -18.15 *
Ilia_Sergeevich [38]

Answer:

q≤-26

Step-by-step explanation:

7.85+q≤-18.15

-7.85     -7.85

q≤-26

7 0
3 years ago
Urgent Math Help Needed ASAP
Marta_Voda [28]

Answer:

Fourth option: 30 days

Step-by-step explanation:

We three path to complete the project:

Path A:

A1 → A2 → A3

10 days → 8 days → 9 days = 27 days


Path B:

B1 → B2 → B3

2 days → 7 days → 3 days = 12 days


Path C:

C1 → C2 → C3

10 days → 8 days → 12 days = 30 days


Then the duration of the critical path is 30 days, we can't conclude the project until each path has finished

7 0
3 years ago
Other questions:
  • Do A triangle with sides measuring 12, 16, and 20 is a right triangle?
    9·1 answer
  • 6 + 23 • 3 =? on e2020
    6·2 answers
  • Which shape could not be a cross section for this cube?
    9·1 answer
  • Geometry help needed
    6·2 answers
  • The distance between (0,-4) and (2,-5)​
    14·1 answer
  • Sam and Liam raced each other up and then down the hill. Sam's average speed up the hill was 1 mph, and his average speed down w
    11·1 answer
  • How do i solve this question
    7·1 answer
  • Add 3 3/5 + 6 3/10 tyyyyy
    10·2 answers
  • Derek and Eric share £30 in the ratio 2:3. How much does Eric get?
    5·1 answer
  • Find all real numbers x such that <br><br> 6x-21&gt;5
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!