Answer:
The Zscore for both test is the same
Step-by-step explanation:
Given that :
TEST 1:
score (x) = 75
Mean (m) = 65
Standard deviation (s) = 8
TEST 2:
score (x) = 75
Mean (m) = 70
Standard deviation (s) = 4
USING the relation to obtain the standardized score :
Zscore = (x - m) / s
TEST 1:
Zscore = (75 - 65) / 8
Zscore = 10/8
Zscore = 1.25
TEST 2:
Zscore = (75 - 70) / 4
Zscore = 5/4
Zscore = 1.25
The standardized score for both test is the same.
Um... it'll take each pipe 80 mins, bcz if together they take that long, then to find the pipes time separately, you just multiply it by two to show it doing the work the other pipe did as well. Is that what you wanted??
The additive inverse of 1/3 is 3/1.
Hope this helps you!
:)
If these four line segments are connected (kind of like a square) then only 4 endpoints are needed, but if they are all separate line segments, then you would need a maximum of 8 endpoints because any line segment has 2 endpoints and 4 line segments with 2 endpoints a piece equals 8 endpoints in total.
I hope this helped! :)