1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
AlladinOne [14]
3 years ago
8

I'm a kid i asked that question people do you unerstand

Mathematics
1 answer:
Olegator [25]3 years ago
5 0
YESI had to reread it a couple of times.
You might be interested in
Y = –3x – 5 help I don’t know the answer please
earnstyle [38]

Answer:

x=-5/3

Step-by-step explanation:

Add 5 to both sides to get 5=-3x.

Then divide by -3.

And get -5/3=x

6 0
3 years ago
Help with those 3 please.. ty
irinina [24]
I really just needed the points no cap monkey
7 0
2 years ago
Read 2 more answers
Consider a system with one component that is subject to failure, and suppose that we have 115 copies of the component. Suppose f
castortr0y [4]

Answer:

Step-by-step explanation:

From the given information:

the mean (\mu) = 115 \times 20

= 2300

Standard deviation = 20 \times \sqrt{115}

Standard deviation (SD) = 214.4761

TO find:

a) P(x > 3500)= P(Z > \dfrac{3500-\mu}{214.4761})

P(x > 3500)= P(Z > \dfrac{3500-2300}{214.4761})

P(x > 3500)= P(Z > \dfrac{1200}{214.4761})

P(x > 3500)= P(Z >5.595)

From the Z-table, since 5.595 is > 3.999

P(x > 3500)=1-0.9999

P(x > 3500) = 0.0001

b)

Here, the replacement time for the mean (\mu) = \dfrac{0+0.5}{2}

= 0.25

Replacement time for the Standard deviation \sigma = \dfrac{0.5-0}{\sqrt{12}}

\sigma = 0.1443

For 115 component, the mean time = (115 × 20)+(114×0.25)

= 2300 + 28.5

= 2328.5

Standard deviation = \sqrt{(115\times 20^2) +(114\times (0.1443)^2)}

= \sqrt{(115\times 400) +(114\times 0.02082249}

= \sqrt{(46000) +2.37376386}

= \sqrt{(46000) +(2.37376386)}

= \sqrt{46002.374}

= 214.482

Now; the required probability:

P(x > 4125) = P(Z > \dfrac{4125- 2328.5}{214.482})

P(x > 4125) = P(Z > \dfrac{1796.5}{214.482})

P(x > 4125) = P(Z >8.376)

P(x > 4125) =1-  P(Z

From the Z-table, since 8.376 is > 3.999

P(x > 4125) = 1 - 0.9999

P(x > 4125) = 0.0001

7 0
2 years ago
All most done thanks for hanging in there
Ber [7]

Answer:

Angle CBE

Step-by-step explanation:

They share the same degree. Or are the same angle in a different place with a  different name.

7 0
2 years ago
Read 2 more answers
One difference between an assembly line process flow and a continuous process flow is that on the assembly line the flow is disc
IgorLugansk [536]

Answer:

True

Step-by-step explanation:

Assemble line is a production process in which parts are joined to the products produced as a partially finished product.

Here the process flow is discreet that is assembled one at a time.

Continous process flow is a type of manufacturing products without disruption of the flow process.

As the name implies,it is continous.

6 0
3 years ago
Other questions:
  • Prudence has 20 pairs of gold earrings and 4 pairs of silver earrings in a drawer in her jewelry box. If she randomly pulls six
    13·1 answer
  • What is 2|u| – |v|, if u = –9 and v = –2? <br><br> A. –18<br> B. 16<br> C. –20<br> D. 20
    14·2 answers
  • Write two ways you could use to find 5+8
    11·2 answers
  • Can I get the answer for the questions at the bottom
    6·1 answer
  • Using the mileage chart below, find the distance between Rapid City and
    11·1 answer
  • Is (2, 2) a solution of y &lt; 4x – 6?<br> Choose 1 answer:<br> А<br> Yes<br> (В<br> No
    7·2 answers
  • Did I get this correct
    5·1 answer
  • While completing a race, Will spent 14 minutes walking. If his ratio of time walking to jogging was 7 : 6, how many minutes did
    12·1 answer
  • Please help, preferably in the next half an hour.
    10·1 answer
  • 2. 8.SP.1.2
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!