<u>Cost center responsibility</u> reports typically focus on the flexible budget variance, which is the difference between actual results and the flexible budget.
<u>Explanation</u>:
The cost center is the responsible center where the manager is only responsible for controlling costs. It is his duty to track the expenses. The performance evaluation of the cost center is based on its flexible budget variance.
The flexible budget variance generally provides the difference between actual results and the flexible budget. The cost center is of two types:
i) Production cost center
ii) Service cost center
The production department, maintenance department, accounting department and human resource department together form the cost center.
Buddists are found closest to the letter "D"
10. The Steam Engine, The Water Wheel, The Coal Burning Engine.
11. Machines became capable of doing most of the manual labor.
12. Polution levels rose and disease became easier to spread. There was also alot of smog in the air from the factories that popped up around that time.
13. a policy or attitude of letting things take their own course, without interfering.
14. Im not all that sure
15. (the question says to pick a change, not to discuss it in detail. only to pick one to discuss in detail) The Roaring Twenties.
All of these took place during the Cold War.