Answer:
12x=10(25+x)
Step-by-step explanation:
Jim's rate=x
Pete's rate=y
Jim and Pete lays the same number of tiles.
So we have,
12x=10y
Pete's can lay 25 more tiles than Jim per hour
We have
y=25+x
Substitute y=25+x into 12x=10y
12x=10y
12x=10(25+x)
12x=250+10x
12x-10x=250
2x=250
x=250/2
=125
x=125
12x=10(25+x) is the equation used to find the rate that Jim can lay tiles
Answer:
True, see proof below.
Step-by-step explanation:
Remember two theorems about continuity:
- If f is differentiable at the point p, then f is continuous at p. This also applies to intervals instead of points.
- (Bolzano) If f is continuous in an interval [a,b] and there exists x,y∈[a,b] such that f(x)<0<f(y), then there exists some c∈[a,b] such that f(c)=0.
If f is differentiable in [0,4], then f is continuous in [0,4] (by 1). Now, f(0)=-1<0 and f(4)=3>0. Thus, we have the inequality f(0)<0<f(4). By Bolzano's theorem, there exists some c∈[0,4] such that f(c)=0.
Step-by-step explanation:
17000
Let the number of panels Plant B produced be x.

LOGa(n)=b i hope this helps.
Answer:
- 0.78
- 0.28
- 0.71
Step-by-step explanation:
I hope this is helpful.