1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
gogolik [260]
2 years ago
14

What is 7/8 x 4 ? ( 7/8 is a fraction)

Mathematics
1 answer:
andrew11 [14]2 years ago
6 0

Answer:

7/2 or 3 1/2

Step-by-step explanation:

7/8*4/1=28/8

Simplify= 7/2 or as a mixed fraction = 3 1/2

Hope this helps

Can I have the brainliest if I am right?

You might be interested in
PLS HELP ME WITH MATH
arsen [322]

Answer:

slope is 3

Step-by-step explanation:

Slope = \frac{change  in  y }{change  in  x }

change in y = (13-7),  (19-13),  (25-19),  (31-25)

change in y = 6

Change in x = (4-2),  (6-4),  (8-6),  (10-8)

Change in x = 2

Therefore slope = \frac{6}{2}

Slope = 3

5 0
2 years ago
The U.S. Bureau of Labor Statistics reports that of persons who usually work full-time, the average number of hours worked per w
alukav5142 [94]

Answer:

The standard deviation of number of hours worked per week for these workers is 3.91.

Step-by-step explanation:

Problems of normally distributed samples can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the zscore of a measure X is given by

Z = \frac{X - \mu}{\sigma}

After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X. Subtracting 1 by the pvalue, we This p-value is the probability that the value of the measure is greater than X.

In this problem we have that:

The average number of hours worked per week is 43.4, so \mu = 43.4.

Suppose 12% of these workers work more than 48 hours. Based on this percentage, what is the standard deviation of number of hours worked per week for these workers.

This means that the Z score of X = 48 has a pvalue of 0.88. This is Z between 1.17 and 1.18. So we use Z = 1.175.

Z = \frac{X - \mu}{\sigma}

1.175 = \frac{48 - 43.4}{\sigma}

1.175\sigma = 4.6

\sigma = \frac{4.6}{1.175}

\sigma = 3.91

The standard deviation of number of hours worked per week for these workers is 3.91.

6 0
3 years ago
What expression is equivalent to 12x⁴ over 4x¹⁶
alexgriva [62]

Answer:

\frac{3}{x^1^2}

Step-by-step explanation:

\frac{12x^4}{4x^1^6}=3x^4/x^16

bring "x^4" to the bottom to subtract it with x^16

3/x^16*x^-4

3/x^12

hope this helps!

7 0
3 years ago
The solution for x2 + 2x + 8 ≤ 0 is
Marina CMI [18]

Answer:

Please use " ^ " for exponentiation: x^2 + 2x + 8 ≤ 0.

Let's solve this by completing the square:

x^2 + 2x + 8 ≤ 0 => x^2 + 2x + 1^2 - 1^2 + 8 ≤ 0. Continuing this rewrite:

(x + 1)^2 + 7 ≤ 0

Taking the sqrt of both sides: (x + 1)^2 = i*sqrt(7)

Then the solutions are x = -1 + i√7 and x = -1 - i√7

There's something really wrong here. I've graphed your function, x^2 + 2x + 8, and can see from the graph that there are no real roots, but only complex roots. Please double-check to ensure that you've copied down this problem correctly.

5 0
3 years ago
Read 2 more answers
The value of a car depreciates by 40% each year. At the end of 2007 the value of the car was £3600 Work out the value of the car
natima [27]

Answer: $6,000

Step-by-step explanation: If set up correctly, the value of the car at the end of 2006 times 0.6 (because the car is losing 0.4 of its value, so it keeps 0.6 of its value) should get you the value of the car at the end of 2007.

The equation should look like this:

(value of the car at the end of 2006) x 0.6 = (value of the car at the end of 2007)

Then you substitute: (value at the end of 2006) x 0.6 = 3600

Then divide: (value at the end of 2006) = 0.6 ÷ 3600

Then substitute again: (value at the end of 2006) = 6,000

Hope this helped you! Feel free to ask me any questions!

3 0
3 years ago
Other questions:
  • I am unsure how to this problem. Please help explain it to me.:
    8·1 answer
  • Find the solution to the system of equations by using either graphing or substitution.
    7·1 answer
  • Let h(x) = e^(kx) + f(x),
    9·1 answer
  • Find an explicit rule for the nth term of the sequence.
    12·2 answers
  • If the sin of angle x is 4 over 5 and the triangle was dilated to be two times as big as the original, what would be the value o
    15·1 answer
  • If X=7 then what does Y=?<br><br>PLEASE HELP FAST!!
    14·1 answer
  • Can you help me plss!!!?? ​
    8·1 answer
  • Triangle IJK, with vertices I(-9,-8), J(-5,-6), and K(-7,-3), is drawn on the coordinate grid below.
    10·1 answer
  • 342 employees prefer a bonus over extra vacation days from a survey of 450 employees what is the population proportion
    7·1 answer
  • What is the kinetic energy of a bicycle that has a mass of 20 kg and is traveling at a velocity of 10 m/sec? KE= .5 x M x V^2
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!