1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Olenka [21]
2 years ago
9

I will repot any links

Mathematics
1 answer:
asambeis [7]2 years ago
7 0

Answer:

Sorry for being late it is a Fewer than 14.05 Hope this helps :D

Step-by-step explanation:

You might be interested in
On a coordinate plane, a line with a 90-degree angle crosses the y-axis at (0, 1), the x-axis at (1, 0), turns at (3, negative 2
lapo4ka [179]

Answer:

maximum value of y = 3

Step-by-step explanation:

line Starts at -4 , 0   & turns at - 1 , 3

Slope = (3 - 0)/(-1 -(-4)) = 3/3 = 1

y = x + c

=> 0 = - 4 + c => c = 4

=> y = x + 4

line after turning crosses the y-axis at (0, 2) and the x-axis at (2, 0)

slope of this line :  (0-2)/(2-0) = -1

y = - x + c

2 = 0 + c => c = 2

=> y = - x + 2

=> y = 2 - x

Values Drawn

x y

-4 0

-3 1

-2 2

-1 3

0 2

1 1

2 0

4 0
3 years ago
Read 2 more answers
A pencil cost $1.20 and a pen cost $2.90. Jasmiah bought an equal number of such pencils and pens. She spent $32.30 more on the
garri49 [273]

Answer:

38

Step-by-step explanation:

hope it helps good day.

3 0
1 year ago
Read 2 more answers
PLEASE HELP!!!!! I WILL GIVE BRAINLIEST TO THE CORRECT ANSWER
Luda [366]

Answer:

Step-by-step explanation:

4 0
2 years ago
What is the slope of the line described by the equation below?
butalik [34]
Y = -6x + 3
In y = mx + b form, the slope will be in ur m position...

y = mx + b
y = -6x + 3

so ur slope (the number in the m position) is -6
4 0
2 years ago
It takes 16 minutes for 9 people to paint 8 walls.how many does it take 4 people to paint 6 walls
luda_lava [24]
The things you can apply to complete this job is workers and time. The job being accomplished is painted walls. This problem defines two jobs. The rate for each of the jobs will be the same. The first job rate is: R=(7 wkr)•(42 min)/(6 walls)R= 49 wkr-min/walls or 49 worker-minutes per wall. This means one worker can paint one wall in 49 minutes. If you think about this job if 7 workers take 42 minutes to do 6 walls it will only take them 7 minutes to do one wall. And it will take one person 7 times as long to do a job as 7 people working together.  This first job rate equals the second job rate R=(8 wkr)•(t )/(8 walls)R=1 t wkr/wall where t is the time to do the second job. Setting the two rates equal to each other and solving for t. t=49 minutes It makes sense if one worker can paint one wall in 49 minutes then 8 workers can paint 8 walls in the same time.  
5 0
3 years ago
Read 2 more answers
Other questions:
  • (06.01 MC) What is the value of the expression shown below? 8 + (7 + 1) 2 ÷ 4 ⋅ 1 over 2 whole to the power of 4. Whoever gets t
    6·1 answer
  • How to show my daughter to do this and it needs to be changed to a mix number.
    11·1 answer
  • Allison has a poster that is 15 in by 18 in. What will the dimensions of the poster be if she scales it down by a factor of one-
    7·2 answers
  • Order from least to greatest
    7·2 answers
  • 1. Write the next two terms in the pattern.
    5·1 answer
  • mrs.corn is makin a turkey dinner. it is 22 pounds. it takes 20 minutes a pound to cook a stuffed turkey and 15 minutes a pound
    15·1 answer
  • Please help! Evaluate the following function.<br> f(x) = -x – 8 for f(-1)
    11·1 answer
  • All of the following represent three multiplied by six except:<br> 3x6<br> 3.6<br> 316)<br> 3:6
    6·1 answer
  • If 20 yards of carpet weighs 30 pounds, how much do 34 yards weigh in pounds?
    11·2 answers
  • Plsss helppp! I will give brainliest!! (13 points!)
    13·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!