<span>Rate of pump A: 1/8 of a pool per hour
Rate of pump B: 1/9 of a pool per hour
Combined rate: 1/8+1/9 = 17/72 +1/9 = 25/72
So if they work together, the two pumps have a combined rate of 25/72 of a pool per hour (i.e in one hour, the two pumps will empty 25/72 of the pool)
</span><span>But we want to empty ONE pool (not 25/72 of one). So we need to multiply 25/72 by some number x to get 1.
</span>
<span>Now solve for x
x=2.88
</span><span>It will take the two pumps 2.88 hours to empty the pool.
2 hours 52 minutes 50 seconds</span>
Since:
ax(2x + y - 5) = 6x^2 +3xy - 15x,
we should factor X out of the second equation to find out the value of a:
6x^2 + 3xy - 15x =
x(6x + 3y - 15),
Now that we factored X out, to find a, we need to find the other common factor:
(6x + 3y - 15) / (2x + y - 5),
which is 3.
Hence the value of a is 3
Answer: Y= 2/3x + 9
Explanation: The equation is in slope-intercept form, y=mx+b. Since it is parallel to the equation, it has the same slope (2/3x) and since b is the x intercept, b is 9.
So 3^X= 2 is an exponential equation. The inverse of an exponential in ln. so take ln of both sides to solve.
Another way is to change the exponential into a log equation
So that would be log with base 3 to the power of 2 equals x.
Answer:
Check the explanation
Step-by-step explanation:
Kindly check the attached image below for the step by step explanation to the question above.