Answer:
It takes 70 minutes for 9 team members (painting 60 sq ft per minute) to paint a 4200 sq ft wall.
Step-by-step explanation:
4800 ÷ 20 = 240 sq ft per team member in 36 minutes
240 ÷ 36 = 6.67 sq ft per team member in 1 minute
6.67 × 9 = 60 sq ft per 9 team members in 1 minute
4200 ÷ 60 = 70 minutes (or 1 hour and 10 minutes)
Answer:
Glass A holds the most, It holds more than glass B because of its cone shape.
Step-by-step explanation:
I hope I helped you, now have a good day and good luck!! ;)
Answer: Reduction
Step-by-step explanation: If the scale factor of a dilation is between 0 and 1, the image will be smaller than the object, a reduction. It would only be an enlargement if the scale factor is greater than 1.
Answer:
a = 9 / 7
step by step explanation:
9 / - a + 15 = 8
Determined the defined range
9 / ( - a ) + 15 = 8 , a ≠ 0
subtract 15 from each side
9 / - a + 15 - 15 = 8 - 15
calculate the difference
9 / - a = - 7
multiply both side of equation by - a
9 / - a × - a = - 7 × - a
9 = 7 a
divide each side by of equation by -7
9 / 7 = 7 a / 7
9 / 7 = a
swap the side of equation . ( optional )
a = 9 / 7