The expression to solve is the
300-7 [4 (3+5)] + 3 to the 3rd power
3 to the third power means 3³, so
300-7 [4(3+5)]+3³
= 300 - 7 [4(8)] + 27
= 300 - 7[32] + 27
= 300 - 224 + 27
= 76 + 27
= 103
so, by solving this we get 103
Answer:
O
Step-by-step explanation:
Answer:
1)The rocket hit the ground at 
2)The maximum height of the rocket = 12.468 feet
Step-by-step explanation:
<u><em>Step(i):-</em></u>
Given equation
y = -2 x² + 5 x + 7 ...(i)
Differentiating equation (i) with respective to 'x' , we get

Equating zero

⇒ -4 x +5 =0
⇒ -4 x = -5
⇒
<em> The rocket hit the ground at </em>
<em></em>
<u><em>Step(ii):</em></u>-
...(ii)
Again differentiating equation (ii) with respective to 'x' , we get

The maximum height at x = 
y = -2 x² + 5 x + 7



<em>The maximum height of the rocket = 12.468 feet</em>
Answer:
$21.25
Step-by-step explanation:
The cost of the 2 adult tickets before the discount is $8 * 2 = $16
The cost of the 2 child tickets before the discount is $5 * 2 = $10
The total cost before the discount is $16 + $10 = $26
The total cost after the discount is
$26 * (1 - 0.15) =
$26 * 0.85 =
$21.25
Answer:
Answer is c
Step-by-step explanation:
In hypothesis testing whether to accept or reject null hypothesis, normally we find one method as using confidence interval. If the test statistic lies within confidence interval, we accept otherwise we reject.
For arriving confidence intervals we add and subtract margin of error from the mean we use in null hypothesis.
Margin of error = std error * critical value of test (Z or t etc)
For the same std deviation, std error = std dev/sq rt of sample size
Thus std error is inversely proportional to the square root of sample size.
If n becomes larger, std error becomes smaller and vice versa.
So margin of error increases for smaller sample size.
Since we have to select confidence level from a small sample, we have to select one which has the greatest margin of error=18
Hence answer is
c) 71%(+/-18%)