Answer:
23 days
Step-by-step explanation:
We are told that the stadium holds 7500 individuals.
Now, if 600 seats have already been made, It means the number of seats left to be made to complete the stadium = 7500 - 600 = 6900 seats
We are told that 300 seats can be made in a day. Thus, number of days to be used to finish the remaining seats = 6900/300 = 23 days
Thus, it will take 23 days to complete all the 7500 seats.
Answer:
The following points are not arranged in a parallelogram or rectangle order.
Step-by-step explanation:
Well first we need to graph the following.
A(1,1) B(2,2) C(3,3) D(4,4)
By looking at the image below we can tell it is not any shape, it’s not a parallelogram or a rectangle.
It is a line with a slope of 1 or x.
<span>Write the equation of the line that satisfies the given conditions, Express the final equation in standard form. Contains the point (2,5) and is parallel to the line x-2y=-5
The given equation can be written 2y=x+5; y = (1/2)x+(5/2)
It's slope is 1/2
So any line parallel to it has slope = 1/2
If the line also passes thru (2,5), 5 = (1/2)2+b; b=4
Therefore the equation you want is y = (1/2)x+4</span>
Answer:
B
Step-by-step explanation:
the supplement is the angle that will add to the other angle to get 180 degrees. 180-129=51 which is B.
n=2
8+8(8-n)=40+8n (distribute 8 through the parenthesis)
8+64-8n=40-8n (add the numbers)
<em>72-</em>8n=40+8n (move the variable to the left side and change its sign)
<em>72</em><em>-</em>8n+8n=40
-8n+8n=40<em>-72</em> (connect like terms)
-16n = -32 (divide both sides by -16)
<u><em>n=2</em></u>