Answer:
-3
Step-by-step explanation:
divide 7 on both sides -21/7 = -3
w=-3
Answer:
0.6170
Step-by-step explanation:
Given that a manufacturing process is designed to produce bolts with a 0.25-in. diameter.
i.e. no of bolts which are produced as per standard is X means then
X is normal with mean = 0.250 and std dev = 0.04
No of bolts tested = 36
If this mean falls outside the interval (0.230,0.270) the production would be shut down.
i.e. P(|x-25|>0.20) =production shut down probability

Answer:
3
Step-by-step explanation:
Given the polynomial : p(x)=1−2x2−3x3+4x
Rearranging : p(x) = -3x³ - 2x² + 4x + 1
Looking at the polynomial Given, we can see that it is a univariate polynomial, that is it has only one variable which is x. Thus for polynomials of this sort, the order of the polynomial is the highest exponent occurring in the polynomial equation. Therefore, the order of the polynomial above is 3, because the highest power of the function is 3.
This means that those with 4 as their highest exponent are of order 4 and those with highest exponent as 2 are of order 2.
Answer:
reduce 10 qauts of 50%
Step-by-step explanation: