Answer:

149 engines in 9th year
Step-by-step explanation:
I think your question is missed of key information, allow me to add in and hope it will fit the original one.
Please have a look at the attached photo.
My answer:
From a look at the photo and the data plot can be represented by the function, so we can pick 2 points in our given graph
- (x1, y1) = (2,60)
- (x2, y2) = (5,99)
The standard form of a linear equation is:
y = mx + b where:
- m is the slope
- b is the y-intercept
We know the slope of the function can be found as following:
so in this situation we have:
<=> 
=> y = 13x + b (1)
Because the line goes through point (2,60) so we substitute it into (1):
60 = 13*2 + b
<=> b = 60 - 26 = 34
=> y = 13x + 34
Now we will substitute x=9 to find the engines produced by company in 9th year as:

Hence, the company will produce 149 engines in 9th year
Answer: Craig's household use of water during the billing period = 129 CFC
Explanation:
Since we have given that
Craig's June water meter's previous reading =6372 CFC
Craig's water meter's present reading =6501 CFC
Craig's household use during the billing period =6501 -6372= 129 CFC
So, we get that
Craig's household use of water during the billing period = 129 CFC
Answer:
Your answer will be D. He knows that 30 × 16 is 5 then multiples 5 by 5 to get 25.
Answer:
5
Step-by-step explanation:
t-u/v
substitute (-1) - (-3)/(1/2)
divide (-1) - (-6)
simplify (-1) + 6
add 5
Answer:
The expected total amount of time the operator will spend on the calls each day is of 210 minutes.
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
n-values of normal variable:
Suppose we have n values from a normally distributed variable. The mean of the sum of all the instances is
and the standard deviation is 
Calls to a customer service center last on average 2.8 minutes.
This means that 
75 calls each day.
This means that 
What is the expected total amount of time in minutes the operator will spend on the calls each day
This is M, so:

The expected total amount of time the operator will spend on the calls each day is of 210 minutes.