If we assume that when producing 190 bicycles vs 170 bicycles the difference in total daily cost is purely attributed to the extra 20 bicycles, THEN the cost to produce 20 bicycles (190 - 170) = 11600 - 10900 = 700
So the cost per bicycle is 700/20 = 35/bike
Now we can subtract the cost of bicycle production to determine the daily fixed cost that is not related to the number of bicycles.
i.e. 170 bicycles x 35 = 5950
So on a day that RideEm produces 170 bicycles, subtract 5950 from total day cost of 10900, which equals 4950.
So the fixed daily costs are $4950, and on top of this, the company pays 35/bike to produce.
Answer:
370.28
Step-by-step explanation:
you add the two whole numbers then you add the two fractions and make them a decimal after that put it all together and u get the answer
Answer:
Step-by-step explanation:
I think you meant x^(3/2). This breaks down in at least two ways:
[x^3]^(1/2), or √(x^3)m or √x³), or
[x^(1/2)]^3 = (√x)^3
Answer:
X=5.5cm
Step-by-step explanation:
Hope this helped.
Answer:
C is the right answer
Step-by-step explanation:
In this case we have the events
<em>A: The subject is telling the truth.
</em>
<em>B: The the polygraph indicates that the subject is lying
</em>
Recall that P(B|A) is defined as the probability that the event B occurs given that the event has already occurred, and is equals to P(B∩A)/P(A).
So, with the events we have defined, <em>P(B|A) indicates the probability that the polygraph indicates lying given that the subject is actually telling the truth.
</em>
The most suitable answer is thus, C