Answer:
Sample Response:Use the values in the table to create ordered pairs. Label the x-axis with the independent variable, hours. Label the y-axis with the dependent variable, dollars. Plot the ordered pairs on the graph. If the variables can be represented as fractional parts you can draw a line from the origin that connects the points.
Step-by-step explanation:
I took one for the team D:
Answer:
c and a
Step-by-step explanation:
the simple logistics would make it equal those 2 answers
1 5/8
1 7/8 - 2/8= 8+7/8 - 2/8= 15/8 - 2/8= 13/8=
1 5/8 is the answer
Answer:
x=-12
Step-by-step explanation:
because 8-12 geta you -4
Answer:
Step-by-step explanation:84% of a contractor’s jobs involves electrical work. 75% of a contractor’s jobs involve plumbing work. Of the jobs that involve plumbing, 90% of the jobs also involves electrical work. Let E = jobs involving electrical work L = jobs involving plumbing work Suppose one of the contractor’s jobs is randomly selected. Using the sixth Excel worksheet, a) Find P(E). 0.84 b) Find P(L). 0.75 c) In words, what does E | L mean? d) Find P(E | L). e) Find P(E and L). f) Are E and L independent events? Why or why not? g) Find P(E or L). h) Are E and L mutually exclusive? Why or why not