Given, 18 pumps----2170 tonnes----10*7 hrs.
So, 16 pumps-------2170 tonnes----10*7*18/16 hrs.
And, 16 pumps-------1736 tonnes----10*7*(18/16)*(1736/2170)hrs. = 63 hrs.
So, no. of days req.= 63/9 = 7 days
Answer:
113.04 sq. in.
Step-by-step explanation:
If the diameter of the circle is 12", then the radius is 6" (half the diameter), and the area "A" is (approximately) 3.14 * 6^2. The calculation is approximate because 3.14 is a rounded value for pi.
Answer:
6
Step-by-step explanation:
Estimate it kid. Look at the existing dots.
The simplified answer would be 14x+17y-11
<h3> </h3><h2> F-{1} (x)= x/6 + 5/6</h2>