Answer:
The answer would be 40!
Step-by-step explanation:
Estimating ~ rounding
I would round 24% (20%), and 289 (300).
using the formula:
= %/100,
I'm looking for "IS"
I multiply 20 (just 20, no percent) by 200 = 4000.
Then I divide by 100 to get the "IS".
That's how I got my answer!
Hope this helps!
Answer:
The prepaid phone plan will have a steeper line and lower y-intercept.
I hope this is right
Step-by-step explanation:
prepaid phone plan y = .20x
contracted phone plan y = .02x + 50
Answer:
![\frac{AB}{A''B''} = \frac{1}{4}](https://tex.z-dn.net/?f=%5Cfrac%7BAB%7D%7BA%27%27B%27%27%7D%20%20%3D%20%5Cfrac%7B1%7D%7B4%7D)
Step-by-step explanation:
Given the information:
- A'B'C' reflection over x = −1
- dilation by a scale factor of 4 from the origin
<=> the two triangles are similar to each other, triangles are similar if they have the same shape, but can be different sizes, so A″B″C″ is 4 time bigger than ABC
=> the relationship between ΔABC and ΔA″B″C″
= ![\frac{AB}{A''B''} = \frac{1}{4}](https://tex.z-dn.net/?f=%5Cfrac%7BAB%7D%7BA%27%27B%27%27%7D%20%20%3D%20%5Cfrac%7B1%7D%7B4%7D)
We choose C.
Hope it will find you well.
Answer:![(-2)^{2}*7^{5}](https://tex.z-dn.net/?f=%28-2%29%5E%7B2%7D%2A7%5E%7B5%7D)
Step-by-step explanation:
You have to group all of the same one's together and however many there is, you add that number as the exponent.
There were 2 "(-2)" so that became
, and there were 5 "7" so that became
. You keep the symbol and put it together which became ![(-2)^{2}*7^{5}](https://tex.z-dn.net/?f=%28-2%29%5E%7B2%7D%2A7%5E%7B5%7D)
If you would like to know the production rate of factory E, you can calculate this using the following steps:
Factory Number of days Number of shirts
A 2 600
B 3 900
C 4 1200
D 5 1500
Factory E can make shirts at the same rate as the first four factories:
600 shirts / 2 days = 300 shirts per day
900 shirts / 3 days = 300 shirts per day
1200 shirts / 4 days = 300 shirts per day
1500 shirts / 5 days = 300 shirts per day
Factory E will make 1800 shirts in 6 days, therefore 1800 / 6 = 300 shirts per day.
The correct result would be:
Factory Number of days Number of shirts
E 6 1800