5 yellow marbles out of total of 17 marbles so 5/17
Answer:
9.18% probability the miners find more than 16 ounces of gold in the next 1000 tons of dirt excavated
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

What is the probability the miners find more than 16 ounces of gold in the next 1000 tons of dirt excavated?
This is 1 subtracted by the pvalue of Z when X = 16. So



has a pvalue of 0.9082
1 - 0.9082 = 0.0918
9.18% probability the miners find more than 16 ounces of gold in the next 1000 tons of dirt excavated
Answer:
9 in
Step-by-step explanation:
a short bored is 9 in
37-10=27
27÷3=9
So that means a short bored is 9 in
Correct answer is: distance from D to AB is 6cm
Solution:-
Let us assume E is the altitude drawn from D to AB.
Given that m∠ACB=120° and ABC is isosceles which means
m∠ABC=m∠BAC = 
And AC= BC
Let AC=BC=x
Then from ΔACD , cos(∠ACD) = 
Since DCB is a straight line m∠ACD+m∠ACB =180
m∠ACD = 180-m∠ACB = 60
Hence 

Now let us consider ΔBDE, sin(∠DBE) = 
