1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
melisa1 [442]
3 years ago
13

Relationship between civil engineering and geology​

Engineering
1 answer:
natka813 [3]3 years ago
5 0

Answer:

Geological and civil engineers sometimes work together, but have very different responsibilities. While geological engineers study the earth's inner and outer surface to evaluate potential mining and infrastructure construction sites, civil engineers design the infrastructure to be built.

You might be interested in
Argon is compressed in a polytropic process with n = 1.2 from 120 kPa and 10°C to 850 kPa in a piston–cylinder device. Determine
Ivenika [448]

Answer:

W=-109.12 kJ/kg

Q=-76.34 kJ/kg

Explanation:

The needed work W we will calculate by using the work equation for polytropic process and the heat transfer Q we will calculate by using the energy balance equation.

Before the calculations we first need to determine the final temperature T2. We will do that by using the given initial temperature T1 = 10°C, the given initial p_1 = 120 kPa and final p_2 = 800 kPa pressure and the polytropic index n = 1.2. Before the calculation we need to express the temperature in K units.  

T1 = 10°C + 273 K = 283 K  

T2 = ((p_2/p_1)^(n-1)/n)* T1

T2 = 388 K

Now we can use the heat capacity C_v, = 0.3122 kJ /kg K and the temperatures T1 and T2 to determine the change in internal energy ΔU.  

ΔU = C_v*(T2-T1)

ΔU = 32.78 kJ/kg

to determine the work we will also need the initial v1 and final v2 specific volume. The initial specific volume v1 we can determine from the ideal gas equation. For the calculation we will need the initial pressure p_1, temperature T1 and the specific gas constant R = 0.2081 kJ /kg K.  

v1=R*T1/p_1

v1=0.4908 m^3/kg

For the final specific volume we need to replace the initial temperature and pressure with the final.  

v2=R*T2/p_2

v2=0.1009 m^3/kg

The work W is then:  

W=p_2*v2-p_1*v1/n-1

W=-109.12 kJ/kg

The heat transfer Q we can calculate form the energy balance equation. For the calculation we will need the calculated work W and the change in internal energy ΔU.  

Q=W+ΔU

Q=-76.34 kJ/kg

7 0
4 years ago
Anne works for NASA. She was responsible for developing an aerodynamic design of a space shuttle. What type of engineer is she?
lina2011 [118]

Answer:

She is a aerospace engineer.

Explanation:

This is because she works is the aerospace industry, so she must be an aerospace engineer.

7 0
3 years ago
Please help meh!!! I appreciate it!
Rasek [7]

Answer:

★ The answers ARE B,A,D,D,A !

Explanation:

Hope you have a great day

7 0
3 years ago
A material removal process in which a sharp cutting tool is used to mechanically cut away material so that the desired part geom
Anit [1.1K]

Answer: True

Explanation: Machining is a procedure in which a material is given a  desired shape by removing the excess with help of tool sharp enough to cut the material.It is a sort of primary manufacturing process which is carried out in manufacturing sector .There are many removal processes for the work piece such as drilling, turning ,etc.Therefore the given statement in the question is true.

5 0
3 years ago
What happens to the electrolyte, during discharging?
lisov135 [29]
During the discharge ions combine with anode to form a compound and release one or more electron.
3 0
3 years ago
Other questions:
  • The tool that can be used to depict main causes for an identified quality problem, subdivided into categories represented as mac
    12·1 answer
  • The combustion of the paraffin oil, which is a highly refined fossil fuel product similar to kerosene composed of C14-C16 hydroc
    8·1 answer
  • Which one of these is NOT considered a skill?
    9·2 answers
  • Two sections of a pressure vessel are to be held together by 5/8 in-11 UNC grade 5 bolts. You are told that the length of the bo
    11·1 answer
  • Given asphalt content test data:
    8·1 answer
  • What kinds of problems or projects would a civil engineer work on?
    14·1 answer
  • (Laminar flow) A fluid flows through two horizontal pipes of equal length which are connected together to form a pipe of length
    6·1 answer
  • How many points do you need to define for the rectangle
    14·1 answer
  • A BOD test is run using 30 mL of wastewater and 270 mL of dilution water. The initial DO of the mixture is 9.0 mg/L. After 5 day
    15·1 answer
  • Can I have free money? I want to get a new pc
    13·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!