Answer:
8.5 hrs * 5 day work week = 42.5 hrs. But usually 0.5 hr per day is considered lunch and is usually not payed so theoretically the workweek is only 40 hrs per week (full time)
Step-by-step explanation:
Answer:
Step-by-step explanation:
Answer:
A. Different volumes of water are moved different distances.
Step-by-step explanation:
Integration is used to find work required to pump water out of a tank because different volumes of water are moved different distances and to sum it all we the tool required is integration. Moreover, work done is a path function or an inexact differential. It does depend upon the path followed by the process.
hence the correct answer is A.
Answer:
ok fking fk it ill just tell you, the most affordable way is doing it as a 4*3 package, the length will be 16, width 12, and the height 5. the area will be 960in^3, and the SA will be 664 in^2
Step-by-step explanation: