I'd go with Checking account B because its cheaper .
Answer:
question 1: m = 3/2
question 2: m = 1/95
Step-by-step explanation:
Slope intercept form of equation is of form
y = mx+c
where m is the slope of line and c is the y intercept of the line.
Y intercept is point on y axis where the line intersects the y axis.
____________________________________
given
y = 3/2 x
comparing it with y = mx+c
we have m = 3/2 .
since y = 3/2 x does not have constant term so it can be taken as 0. hence c is 0
_________________________________________
slope for any two point (x1,y1) and (x2,y2) on coordinate plane is given by
slope = (x2-x1)/y2-y1)
From the given table lets take two point as (2,190) and(4,380)
Thus, slope m is given by
m = (4-2)/(380-190) = 2/190 = 1/95
m = 1/95
Though, slope can be taken by dividing y by x (y/x). It is good practice to use two point form formula as given above . Provided two points are given
Please mark it the brainliest.
Answer:
(86.2,0) is the x-intercept.
Step-by-step explanation:
You can use the slope formula to figure this one out:
Just use two of the points on the table, any of them will work:


Now you have the slope of the equation, now using the y-intercept equation you can substitute the variables for point of the table and the new slope.:

Now just solve for b to get the y intercept:

Now you have the y-intercept so you just have to plug in 0 to the y spot and it will calculate the x-intercept.

And that's the x-intercept.
Answer:
4.6 hours
Step-by-step explanation:
we first need to calculate the total distance he covered and total time taken whole for the journey.
Distance= speed X time
time = Distance/speed
let the total distance be X. he covers 2/5 if the journey first.
2/5 = 0.4
Time = 0.4x/45 hours
the remaining journey is 3/5x
he covers 1/3 X 3/5= 0.2x
time taken = 0.2/90 X hours
the remaining distance = 100× 1.2 = 120km
we add 0.4x + 0.2x to get the fraction he had covered
0.6x.
the remaining distance was X - 0.6x = 0.4 X
thus 120 km represents 0.4x of the journey
we calculate now the value of X
0.4x = 120
X = 300km
Total time taken = 0.4x/45 + 0.2/90 + 1.2 hours
replace X to get time
2.7 hours + 0.7 hours + 1.2 hours
= 4.6 hours
9514 1404 393
Answer:
Step-by-step explanation:
The equations need to match the problem statements. If we let C and S represent the costs of Cherry and Sweet potato pies, respectively, then the revenue from each sale can be expressed as an equation.
1 cherry and 7 sweet potato for $114 ⇒ C +7S = 114
14 sweet potato and 11 cherry for $309 ⇒ 11C +14S = 309
Note that we have used C and S in the second equation in the same order as they appeared in the first equation, even though the problem statement has that order reversed. This facilitates solving the equations using elimination or Cramer's rule.
These equations match Option 4.
__
The cost of a cherry pie can be found by eliminating S from the equations. We can do that by subtracting twice the first equation from the second:
(11C +14S) -2(C +7S) = (309) -2(114)
9C = 81 . . . . . simplify
C = 9 . . . . . . . divide by 9
The cost of each cherry pie is $9.