1) Road Trip: Let’s say two friends are meeting at a playground. Mary is already at the park but her friend Bob needs to get there taking the shortest path possible. Bob has two way he can go - he can follow the roads getting to the park - first heading south 3 miles, then heading west four miles. The total distance covered following the roads will be 7 miles. The other way he can get there is by cutting through some open fields and walk directly to the park. If we apply Pythagoras's theorem to calculate the distance you will get:
(3)<span>2 </span>+ (4)2 =
9 + 16 = C2
√25 = C
5 Miles. = C
Walking through the field will be 2 miles shorter than walking along the roads. .
2) Painting on a Wall: Painters use ladders to paint on high buildings and often use the help of Pythagoras' theorem to complete their work. The painter needs to determine how tall a ladder needs to be in order to safely place the base away from the wall so it won't tip over. In this case the ladder itself will be the hypotenuse. Take for example a painter who has to paint a wall which is about 3 m high. The painter has to put the base of the ladder 2 m away from the wall to ensure it won't tip. What will be the length of the ladder required by the painter to complete his work? You can calculate it using Pythagoras' theorem:
(5)<span>2 </span>+ (2)2 =
25 + 4 = C2
√100 = C
5.3 m. = C
Thus, the painter will need a ladder about 5 meters high.
3) Buying a Suitcase: Mr. Harry wants to purchase a suitcase. The shopkeeper tells Mr. Harry that he has a 30 inch of suitcase available at present and the height of the suitcase is 18 inches. Calculate the actual length of the suitcase for Mr. Harry using Pythagoras' theorem. It is calculated this way:
(18)<span>2 </span>+ (b)2 = (30)2
324 + b2 = 900
B2 = 900 – 324
b= √576
= 24 inches
The correct answer is actually choice D.
Answer:
<h3>2T/9</h3>
Step-by-step explanation:
A construction manager needs 12 workers to complete a building project in 54 days, we can write;
12 workers = 54 days
T find the number of workers needed to complete the same project in T days, we will write;
x workers = T days
Divide both equations
12/x = 54/T
Cross multiply
12T = 54x
x = 12T/54
x = 2T/9
Hence the number of workers needed to complete the same project in T days is 2T/9 workers
Answer:
90% of people marry there 7th grade love. since u have read this, u will be told good news tonight. if u don't pass this on nine comments your worst week starts now this isn't fake. apparently if u copy and paste this on ten comments in the next ten minutes you will have the best day of your life tomorrow. you will either get kissed or asked out in the next 53 minutes someone will say i love you