Tile costs $28 per square meter. how much will it cost to cover the counter top with new tile?( 4.36 square meters)
28 x 4.36 = $122.08
The answer is
96%.
Explanation:
It is generally presumed that the scores are normally distributed.
1) You are given how many standard deviations from the mean Jeremy's score is. This is exactly the definition of the
z-score. Therefore z = 1.75
2) Look at a left-tail z-table in order to find the area of the normal curve on the left of your z-score (see picture attached). A = 0.9599
3) Multiply the area by 100 in order to find the
percentile:
<span>0.9599 </span>× 100 = 95.99
Therefore, 95.99% of the students scored less than Jeremy.
Hence, the answer is
96%.
Answer:
m = -1
Step-by-step explanation:
Slope = (y2-y1)/(x2-x1)
Therefore,
slope = (-12-(-9))/(-6-(-9))
= -3/3
=-1
Answer:
PLease
Step-by-step explanation:
First solve the length of side BC, CD, EF and FA
Since BC = CD = sqrt( 10^2 + 10^2)
BC = CD = 14.1421
FA = EF = sqrt(10^2 + 20^2)
= 23.3607
So the perimeter = 10 + 10 + 14.1421 + 14.1421 + 23.3607
= 93
The area is made up be triangle FAE, rectangle ABDE and
triangle BCD
A = 0.5(20)(20) + (10)(20) + 0.5(20)(10)
<span>A = 500 sq units</span>