Answer:
x=3
Step-by-step explanation:
No matter what happens to the y value, x always stays on the number 3, so y does not matter for this equation, it is simply x=3.
Answer:
592 hours
Step-by-step explanation:
Given
Required
Determine the time taken to cover the area
Since, the oil formed a circular pattern; the question will be answered using area of a circle
Let t represent the time take to cover 11000m²;
The relationship between these parameters is:
Substitute 3.14 for π
Divide both sides by 3.14
Take square root of both sides
Divide both sides by 0.10
<em>(</em><em>Approximated)</em>
<em>Hence, it'll take approximately 592 hours to cover the given area</em>
Answer: Option(c) is correct.
Step-by-step explanation:
Data engineering is a set of guidelines and approaches that characterize the kind of information gathered and how it is put away and utilized.
The Data engineering includes the means, for example, gathering of data, storage of information in the databases and access the information at whatever point required.
So,data engineering refers to information storage, database plan and information structures.
Consequently Data quality isn't clarified in Data engineering.