16.5 degrees below the starting temp, whatever that is. If its 0, then -16.5 degrees.
The first equation would be (.5)5-11=-8.5, because the metal has been cooling for 5 hours.
The device that 'aids' in the cooling would be -5-3=-8, because it is a separate variable that cools the metal, so the amount the device cools is independent of the natural cooling amount, and the equation is independent of the natural cooling equation.
You then add -8.5 and -8, because the device has lowered 8.5 degrees and 8 degrees. This equals -16.5 degrees, or a decrease of 16.5 degrees.
For question 1:
1% = 120 ÷ 100 = 1.2
15% = 1.2 × 15 = 18
So, 15% of 120 is 18
For question 2:
68.4 ÷ 72 = 0.95
0.95 × 100 = 95%
So, the percentage is 95%
For question 3,
1% = 12.5 ÷ 8 = 1.5625
100% = 1.5625 × 100 = 156.25
So, 8% of 12.5 is 156.25.
For question 4,
1% = 48 ÷ 40 = 1.2
100% = 1.2 × 100 = 120
So, 40% of 48 is 120.
For question 5,
1% = 195 ÷ 100 = 1.95
62.5% = 1.95 × 62.5 = 121.875
So, 62.5% of 195 is 121.875
Step-by-step explanation:
if each the bonus is shared equally each will get 420
if 40% is shared by managers each manager will get 560
if 7 sales persons share 60% each will get 360
therefore Peter salesperson will get 360
but he thinks he will get 336 because if 420 is 125% that is including his extra 25% then hundred percent of the 420 is 336 which is not what he will get there for Janet is correct
Answer:
The correct answer is 12 and a half or 13 weeks.
Step-by-step explanation:
First, convert the values to decimals.
27 1/2 = 27.5
2 1/4 = 2.25
Then, divide miles of road that need to be repaved by the number of miles that are repaved per week.
27.5/2.25 = 12.2222222222222
Round that up to 12 and a half weeks or 13 weeks.