Answer:
6 men finish a piece of work in 8 days
1 men finish a piece of work in 8*6 days
4men will finish a piece of work in 48/4
days
..
which is equal to 12 days
we know that
the perimeter of the rectangle is equal to

where
P is the perimeter of the rectangle
W is the width of the rectangle
L s the length of the rectangle
In this problem

Substitute the values in the formula above


therefore
the answer is
the length of the longer side of the rectangle is equal to 
First, X^2 while x is 4 =4^2, which is 4x4, which is 16
3X while x is 4 is 12. 16-12=4. So the answer is 4
Answer:
<h2>30.67 pounds of 32% copper alloy and 10.33 pounds of 65% copper alloy</h2>
Step-by-step explanation:
First alloy contains 32% copper and the second alloy contains 65% alloy.
We wish to make 44 pounds of a third alloy containing 42% copper.
Let the weight of first alloy used be
in pounds and the weight of second alloy used be
in pounds.
Total weight =

Total weight of copper = 

Subtracting 32 times first equation from second equation,

∴ 30.67 pounds of first alloy and 13.33 pounds of second alloy were used.