1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Nataly [62]
3 years ago
12

Write an equation for the cubic polynomial function whose graph has zeroes at 2, 3, and 5.

Mathematics
2 answers:
tiny-mole [99]3 years ago
7 0

Answer:

sample response:  None of the roots can have multiplicity because the polynomial is cubic and 3 roots are given. Write each root as a linear factor, then multiply the three factors to get the expression for the function.

Step-by-step explanation:

allochka39001 [22]3 years ago
3 0
F(x) = (x - 2)(x -3)(x - 5)


You might be interested in
What is the value of x?<br><br> Enter your answer in the box.<br><br> X=
vodomira [7]

Answer:

x = 80

Step-by-step explanation:

The sum of the 3 angles in a triangle = 180°

Sum the 3 angles and equate to 180

x + 30 + 70 = 180, that is

x + 100 = 180 ( subtract 100 from both sides )

x = 80

7 0
3 years ago
The perimeter of a rectangular slab of concrete is 24 meters. If the length of the
-Dominant- [34]
It cant be 5 the length has to bw 10

5 0
3 years ago
Read 2 more answers
Peter ran 15 miles without stopping during the marathon. Anne ran the distance that Peter ran before she stopped.    How far did
Anika [276]
The Answer Should be C
8 0
3 years ago
.In the Star Wars franchise, Yoda stands at only 66 centimeters tall. Suppose you want to see whether or not hobbits from the Lo
r-ruslan [8.4K]

Answer:

We conclude that the average height of hobbit is taller than Yoda.

Step-by-step explanation:

We are given that in the Star Wars franchise, Yoda stands at only 66 centimetres tall.

From a sample of 7 hobbits, you find their mean height \bar X = 80 cm with standard deviation s = 10.8 cm.

<u><em /></u>

<u><em>Let </em></u>\mu<u><em> = average height of hobbit.</em></u>

So, Null Hypothesis, H_0 : \mu \leq 66 cm      {means that the average height of hobbit is shorter than or equal to Yoda}

Alternate Hypothesis, H_A : \mu > 66 cm      {means that the average height of hobbit is taller than Yoda}

The test statistics that would be used here <u>One-sample t test statistics</u> as we don't know about population standard deviation;

                     T.S. =  \frac{\bar X-\mu}{\frac{s}{\sqrt{n}}}  ~ t_n_-_1

where, \bar X = sample mean height = 80 cm

             s = sample standard deviation = 10.8 cm

             n = sample of hobbits = 7

So, <u><em>test statistics</em></u>  =  \frac{80-66}{\frac{10.8}{\sqrt{7}}}  ~ t_6

                              =  3.429

The value of t test statistics is 3.429.

<em>Now, at 0.01 significance level the t table gives critical value of 3.143 for right-tailed test. Since our test statistics is more than the critical value of t as 3.429 > 3.143, so we have sufficient evidence to reject our null hypothesis as it will fall in the rejection region due to which </em><em><u>we reject our null hypothesis</u></em><em>.</em>

<em />

Therefore, we conclude that the average height of hobbit is taller than Yoda.

3 0
3 years ago
How many turning points can a polynomial with a degree of 7 have?
Gre4nikov [31]
The best answer to this question is A because the graph of a polynomial can have up to 1 less turning point than its highest degree. For example, a 10th degree polynomial can have 9 or less turning points. 
6 0
3 years ago
Other questions:
  • After completing 60 laps in a race, the runner has completed 24% of the race. How many laps does the race have?
    14·1 answer
  • Tell if the slope is positive, negative, zero, or no slope.
    6·2 answers
  • The value of n is both 5 times as much as the value of m and 36 more than the value of m. What are the values of n and m? Explai
    6·1 answer
  • How to do this cause I am confused
    5·1 answer
  • A construction company needs to remove 4 1 6 tons of dirt from a construction site. They can remove 8 9 tons of dirt each hour.
    10·1 answer
  • The video rental kiosk rented out 130 videos on Monday, 124 on Tuesday, 80 on Wednesday, and 74 on Thursday. If the kiosk has th
    14·1 answer
  • Please answer!! will give brainliest
    12·2 answers
  • No link just right answer
    9·2 answers
  • Plz help meeee! I need help on this math problem!
    5·2 answers
  • HELPPP
    15·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!