Domain = x<18000(You cant og a negative number)
Am I actually supposed to graph it? enter the equation on desmos.com
It takes longer to make the same altitudinal gain
t=50log(18000/(18000-4000))=50log(18000/14000)=5.457
Subtract x and mutiply v and add the answer
The answer is 73.33333333 (repeated). You can also write it as 73 or 73.3 with a line over the 3 (after the decimal point) to indicate it being repeated.
Answer:
For the 99th percentile, we have X = 206 seconds.
Step-by-step explanation:
Problems of normally distributed samples can be solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

99th percentile:
Value of X when Z has a pvalue of 0.99. So we use 




For the 99th percentile, we have X = 206 seconds.