A number - n
five times the number - 5n
nine more than five times the number - 5n+9
The answer is D.
Solution,
y = -x-4......(i)
3x + y =- 16.......(ii)
Now,
Substituting the value of y in equation (ii)
or, 3x + (-x-4)= -16
or,3x - x - 4 = -16
or, 2x= -16 +4
or, x = -12/2
: x = -6
Then,
Substituting the value of x in (i) equation;
or,y= -(-6) - 4
or,y= 6 - 4
: y =2
Answer:
C. The value of f (4) is 60, and it represents the number of hours of work remaining for the month after working for 4 days
Step-by-step explanation:
So 5 time 4 equals 20...!
80 minus 20= 60
dropped $3 means "-3", increased $6 means "+6"
the price dropped twice so 2(-3) and increased once by 6
so, 2(-3) + 6 = 0
the change in price is $0
Complete question :
Jeremiah plans on building a 5 meter long garden walkway that is paved with square stones that measure " 5/6 meter on each side. There will be no spaces between the stones. How many stones will be needed to complete the garden walkway?
Answer:
12
Step-by-step explanation:
Given that:
Length of square block to be used = 5/6 meters
Length of garden. Walkway = 5 m
Since length of walkway is the same on both sides, then the Total length = 5m + 5m = 10 meters
Number of square stones required :
Total length of walkway / side length of stones to be used
= 10 meters ÷ (5/6) meters
= 10 * 6/5
= 60 / 5
= 12 stones