1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
SSSSS [86.1K]
3 years ago
14

Percentage:

Mathematics
1 answer:
masha68 [24]3 years ago
5 0
20 percent
If you cross multiply 30 w/ 100 and then divide it by 150 you will get 20.
You might be interested in
Help! <br> The slope of the line below is -3.
mylen [45]

Answer:

D. y + 7 = -3(x - 5)

Step-by-step explanation:

Point-slope form: y - y₁ = m(x - x₁)

⇒ y - (-7) = -3(x - 5)

⇒ y + 7 = -3(x - 5)

8 0
3 years ago
Read 2 more answers
A .Dog and a cat are 200 meters apart when they see each other. The dog can run at a speed of 30 m/sec, while the cat can run at
Mila [183]

Answer:

33 ¹/₃ seconds

Step-by-step explanation:

Since the dog is 30 - 24 = <em>6 m/s faster than the cat</em>, that means that the dog is <em>6 meters closer to the cat each second</em>.

So, that gap will close in 200/6 = 33 ¹/₃ seconds.

7 0
4 years ago
Only musiclover10045 aloud to anwsor this
svp [43]
It can be separated into 10 * 3 * 6 and 4 * 3 * 6
 the answer would be B<span />
7 0
3 years ago
Read 2 more answers
A plane flies 1.4 hours at 150 mph on a bearing of 10. It then turns and flies hours at the same speed on a bearing of . How far
Gnesinka [82]

Answer:

The answer is "1035.76 miles"

Explanation:

The aircraft flies at 120 mph for 1.5 hours at a 10^{\circ} bearing, then flies at the very same speed at 100^{\circ} bearings for 8.5 hours.

However an angle of 100-10 = 90^{\circ} between displacements

First shifts= 1.5 \times 120 = 180\  miles.

Second shift = 8.5\times 120 = 1020\ miles.

These two shifts are at 90^{\circ} and therefore the final shift is:

\to \sqrt{180^2+1020^2}=1035.76 \ miles

4 0
3 years ago
Five men working six hours a day take eight days to fill a trench. How long does it take 3 men working eight hours a day to fill
Oduvanchick [21]

Answer:

The correct answer is 10 days.

Step-by-step explanation:

To fill a trench, 5 men work for 6 hours a day for eight days.

Total work hours required is given by 5 × 6 × 8 = 240 hours.

The same work is supposed to be done by 3 men working 8 hours a day.

Let these three men need to work for x days.

Therefore total work hour these group of three men gave = 3 × 8 × x = 24x hours

Therefore the work hour of both the group of 5 men and 3 men should be equal.

⇒ 24x = 240

⇒ x = 10

Therefore the group of 3 men have to work for 10 days to fill the trench.

6 0
3 years ago
Other questions:
  • "Eventually the things in life that gave you pause mean nothing. Time... becomes your friend." (math 1 help plz)
    9·2 answers
  • Geometry Help please?
    10·1 answer
  • What is the value of the expression when b = 3? 4b to the 4 power
    15·1 answer
  • Example and Answer Please.Giving Brain
    12·1 answer
  • What fraction is equivalent to 2 over negative 3
    14·2 answers
  • Example 1. An iPod costs $176. It is on sale for 20% off and will be taxed at a rate of 7% on the sale price. What will be the t
    5·2 answers
  • What three things must be true in order for two figures to be similar?<br><br> (written response)
    12·1 answer
  • What’s the midpoint of the segment with the following endpoints.<br> (-2,1) and (6,-3)
    14·2 answers
  • 3x + 18 *
    8·2 answers
  • Which of these inequalities is graphed below? NA w 1519 he darrer 14 li AN W UM AN ww 12+ 9 6 3 wao WA ME BAL - 15 - 12-9-6-3 -
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!