Hi there,
the first part equals 4/45 and the second part equals 7/9
4/45 divided by 7/9 = 0.00141093474
Hope this helps :)<span>
</span>
Answer: i THINK it might be c
Step-by-step explanation: dont hold me to it tho. its just a guess. typed all of the equations in desmos but none of them came out exact. sorry love
First, let x be the number of hours it will take for Hector to finish the same job alone. This means that every hour, Hector can do 1/x of the job. The amount of work done by Shawn and Hector in 6 hours should be equal to 1 complete work. This can be expressed as,
(1/9 + 1/x)(6) = 1
The value of x is 18. Thus, Hector can to 1/18 of the job in one hour.
The width is 48 and the length is 144. I think
Answer:
23
Step-by-step explanation:
7m + 9 =
7 x (2) + 9 =
14 + 9 =
23
<em>Hope that helps!</em>