1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
o-na [289]
2 years ago
15

A

Mathematics
1 answer:
pogonyaev2 years ago
4 0

Check the picture below.

Make sure your calculator is in Degree mode.

You might be interested in
Which decimal number is the smallest 1.001 1.1 1.01 1.011
ddd [48]
1.001 is the smallest :)))
3 0
3 years ago
A baseball team practices 4 times a week. Each practice lasts for 115 minutes. The team practiced for 12 weeks during the season
Xelga [282]

Answer:

5520 min

Step-by-step explanation:

4*115=460

460*12=5520

4 0
3 years ago
Read 2 more answers
Lonna had 30 minutes to do a three-problem quiz. She spent 11 minutes on question A and 4
STatiana [176]

Answer:

She had 15 minutes left.

Step-by-step explanation:

30 - 11 = 19

19 - 4 = <em>15</em>

8 0
3 years ago
Read 2 more answers
Records indicate that for parts coming out a hydraulic repair shop at an airplane rework facility, 30\% will have a shaft defect
mrs_skeptik [129]

Answer:

P(A|B) = P(A∩B)/P(B) = 100%

Which means that there is 100% probability that the item has at least one type of defect given that the item has only a shaft defect.

Step-by-step explanation:

Conditional probability P(A|B) can be expressed as;

P(A|B) = P(A∩B)/P(B) .....1

Given;

30% will have a shaft defect,

15% will have a bushing defect,

and 65% will be defect-free

Total probability = 100% = P(shaft or/and bushing defect) + P(defect free)

P(shaft or/and bushing defect) = 100% - P(defect free)

= 100% - 65% = 35%

And

P(shaft or/and bushing defect) = P(shaft def only) + P(bushing def only) + P(shaft and bushing defect)

P(shaft or/and bushing defect) = P(shaft defect) + P(bushing defect) - P(shaft and bushing defect)

Substituting the values we have;

35% = 30% + 15% - P(shaft and bushing defect)

P(shaft and bushing defect) = 45% - 35% = 10%

Let A="The item has at least one type of defect"; and B="The item has only a shaft defect".

P(A) = P(shaft or/and bushing defect) = 35%

P(B) = P(shaft only defect) = 30% - 10% = 20%

P(A∩B) = 20%

Substituting into equation 1

P(A|B) = P(A∩B)/P(B) = 20%/20%

P(A|B) = 1/1 = 100%

Which means that there is 100% probability that the item has at least one type of defect given that the item has only a shaft defect.

5 0
3 years ago
Can someone please help me with this problem?
Galina-37 [17]

Answer:

Move the top side down 2 meters

4 0
3 years ago
Other questions:
  • Solve for AB. Round your answer to the nearest tenth if necessary.
    10·2 answers
  • 7) State the prime factorization of 30.
    7·1 answer
  • Please I need your help for this question? ​
    14·2 answers
  • the stage for a school play is 70 feet wide. A set for the play will be built in two sections, separated by 5 feet in the center
    12·1 answer
  • Which of the following quadrilaterals are classified as types of parallelograms?
    8·2 answers
  • What’s three points that satisfy the system of inequality’s of 4x+6y&lt;24
    8·1 answer
  • At Avery Middle School, 273 students responded to a survey asking whether a Bulldog, a Lion, or a Tiger should be the new school
    15·2 answers
  • Here is a picture of my rabbit, her name is Bianca. Have a beautiful day :)
    10·1 answer
  • 3. The angle measures of a triangle are shown in the diagram below.<br><br> What is the value of x?
    8·1 answer
  • Answer A and B. I will give the brainliest to the best answer.
    14·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!