The cost of the table would be $150. 40% of $250 is $100.
2^9 = 2 x 2 x2 x 2 x 2 x 2 x2 x 2 x 2 = 512
2 ^9 = 512
Answer:
9 is the answer
Step-by-step explanation:
3/5 or 60%.
2/3 hour is 40 minutes, so 1/3 is 20 minutes.
40 minutes have passed and 2/5 of the progress on the floor is complete. In 20 minutes, 1/5 of the work is complete. Add 20 minutes to 40 minutes to get 60 minutes, or an hour.
Because of this, we need to add the progress of 20 minutes and 40 minutes. 1/5+2/5=3/5.
So since 2/5 of the washing machines have been sold that means 3/5 remain in the store
first find the number of washing machines that were in the store before any were sold
X is the number of washing machines in the store before selling
18=(3/5)X
18/(3/5)=X
X=18*(5/3)
X=30
so at the beginning there were 30 machines
then multiply the percent sold (2/5) by the number at beginning to find the number sold
(2/5)*30=12
so 12 machines were sold
to find the cost per machine divide the total price by number of machines sold so
$3840/12= $320
so the answer is $320 per machine