1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Alenkasestr [34]
2 years ago
10

A shipment of 50,000 transistors arrives at a manufacturing plant. The quality control engineer at the plant obtains a random sa

mple of 500 resistors and will reject the entire shipment if 10 or more of the resistors are defective. Suppose that 4% of the resistors in the whole shipment are defective. What is the probability the engineer accepts the shipment? Do you believe the acceptance policy of the engineer is sound?
Mathematics
1 answer:
Aleks04 [339]2 years ago
3 0

Step-by-step explanation:

remember, the number of possible combinations to pick m out of n elements is C(n, m) = n!/(m! × (n-m)!)

50,000 transistors.

4% are defective, that means 4/100 = 1/25 of the whole.

so, the probability for one picked transistor to be defective is 1/25.

and the probability for it to work properly is then 1-1/25 = 24/25.

now, 500 picks are done.

to accept the shipment, 9 or less of these 500 picks must be defective.

the probability is then the sum of the probabilities to get

0 defective = (24/25)⁵⁰⁰

1 defective = (24/25)⁴⁹⁹×1/25 × C(500, 1)

= 24⁴⁹⁹/25⁵⁰⁰ × 500

2 defective = (24/25)⁴⁹⁸×1/25² × C(500, 2)

= 24⁴⁹⁸/25⁵⁰⁰ × 250×499

3 defective = 24⁴⁹⁷/25⁵⁰⁰ × C(500, 3) =

= 24⁴⁹⁷/25⁵⁰⁰ × 250×499×166

...

9 defective = 24⁴⁹¹/25⁵⁰⁰ × C(500, 9) =

= 24⁴⁹¹/25⁵⁰⁰ × 500×499×498×497×496×495×494×493×492×491 /

9×8×7×6×5×4×3×2 =

= 24⁴⁹¹/25⁵⁰⁰ × 50×499×166×71×31×55×494×493×41×491

best to use Excel or another form of spreadsheet to calculate all this and add it all up :

the probability that the engineer will accept the shipment is

0.004376634...

which makes sense, when you think about it, because 10 defect units in the 500 is only 2%. and since the whole shipment contains 4% defect units, it is highly unlikely that the random sample of 500 will pick so overwhelmingly the good pieces.

is the acceptance policy good ?

that completely depends on the circumstances.

what was the requirement about max. faulty rate in the first place ? if it was 2%, then the engineer's approach is basically sound.

it then further depends what are the costs resulting from a faulty unit ? that depends again on when the defect is usually found (still in manufacturing, or already out there at the customer site, or somewhere in between) and how critical the product containing such transistors is. e.g. recalls for products are extremely costly, while simply sorting the bad transistors out during the manufacturing process can be rather cheap. if there is a reliable and quick process to do so.

so, depending on repair, outage and even penalty costs it might be even advisable to have a harder limit during the sample test.

in other words - it depends on experience and the found distribution/probability curve, standard deviation, costs involved and other factors to define the best criteria for the sample test.

You might be interested in
Solve 4X^2+7 = 8X +4 by using the quadratic formula
Sergio [31]

Answer:

(1.5,0)

(.5,0)

Step-by-step explanation:

Quadratic formula below

We first need to move everything to one side of the equation

4x²-8x+3=0

Then plug everything in

(8±√(-8²-4*4*3))/(2*4)

(8±√16)/8

To calculate the ± we need to do when where it's adding and then negative

we have

(8+4)/8=3/2

and hten

(8-4)/8=1/2

4 0
3 years ago
Helena wrote the equation using point-slope form for the line that passes through the points (5, 1) and (3, 5). Analyze the step
viva [34]

Answer:

In step 2, she didn’t use an x and y from the same coordinate pair

Step-by-step explanation:

see the attached figure to better understand the problem

we have the points (5, 1) and (3, 5)

step 1

Find the slope

The formula to calculate the slope between two points is equal to

m=\frac{y2-y1}{x2-x1}

substitute

m=\frac{5-1}{3-5}

m=\frac{4}{-2}

m=-2

step 2

The equation of the line in point slope form is

y-y1=m(x-x1)

take the point (3,5)

m=-2

substitute

y-5=-2(x-3)

y-5=-2x+6

y=-2x+6+5

step 3

y=-2x+11

therefore

In step 2, she didn’t use an x and y from the same coordinate pair

3 0
3 years ago
Read 2 more answers
Write an equation for the situation then solve for x. After paying $7 for a sandwich, John has $11. With how much money did he s
yKpoI14uk [10]

Answer:

x = 18

Step-by-step explanation:

total money = money spent + money left

x = 7+11

x = 18

8 0
3 years ago
HELP PLEASE 50 POINTS
Dmitrij [34]

Answer:

Function B has a greater rate of change

Step-by-step explanation:

to find the rate of change or slope

Function A

(0,2) (3,5)

m =(y2-y1)/(x2-x1)

   = (5-2)/(3-0)

   = 3/3

m=1


Function B

m =(y2-y1)/(x2-x1)

 = (9-6)/(6-4)

 = 3/2

 = 1.5


Function B has a greater rate of change


4 0
3 years ago
Read 2 more answers
Chris has finished 30% of an art project that has taken him a total of 9 hours so far. If he continues to work at the same rate,
Sveta_85 [38]
There was already a question like this on here so i’m going off the answer already given: 30 hours, i hope it’s right
3 0
2 years ago
Read 2 more answers
Other questions:
  • A roller coaster has 4 cars, each with
    6·1 answer
  • Can a hypothesis ever be 100% proven as a fact? why
    8·1 answer
  • At jacks laundromat, 6 of the washers must be replaced. These washers represent 1/4 of the total number of washers. If w represe
    6·2 answers
  • *PLS ANSWER CORRECTLY WITH DETAILS* What is the surface area of this regular pyramid?
    13·1 answer
  • Can someone please answer this
    12·1 answer
  • Which values from the set (-6,-4,-3,-1,0,2) satisfy this inequality? <br><br> - 1/2 x + 3 &gt; 5
    7·1 answer
  • In function y=f(x), the ? Contains as the possible values of X, while the ? Contains all the possible values of y.
    5·2 answers
  • Ms. Burkhard wants to trim the border below to get rid of the part that is torn. After
    12·1 answer
  • In the diagram given below, ADEF~ ADGH<br> Find q.
    11·1 answer
  • 4 ( − )−62−32( 22− )+2( − )<br><br> please help
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!