Answer: -1.5
Step-by-step explanation:
When population standard deviation is known, then the formula to find the z-test statistic for population mean is given by :-

, where n= Sample size.
= Population mean
= Sample mean
= Population standard deviation.
As per given , we have
(average infants contracted typhoid each month)

n= 4 (No. of months)
Then , the value of the appropriate test statistic will be :




Hence, the value of the test statistic = -1.5
That dont een make no sense tho
Answer: See Explanation
Step-by-step explanation:
The price elasticity of demand will be calculated as:
q = 860 − 20p.
dq/do = -20
p = 38
Elasticity E(p) = (p/q) × dq/dp
= [38 /(860 - 20p)] × (20)
=38 × 20/(860 - 760)
= 7.6
Therefore, the price elasticity of demand when the price is $38 per orange is 7.6
Revenue = price × quantity
= p × q
= p × (860 − 20p)
= 860p - 20p²
Differentiating with respect to p
= 860 - 40p
40p = 860
p = 860/40
p = 21.50
Maximum Revenue = 860p - 20p²
= 860(21.50) - 20(21.50)²
= 18490 - 9245
= 9245
Answer:
700.39cm
Step-by-step explanation:
For a horizontal distance of 30cm, the drop is 1cm, now we need to get the drop for horizontal distance of 700 cm to maintain the same slope
Using the concept of cross multiplication
30cm=1 cm drop
700 cm=x
30x=700
X=700/30=70/3=23 ⅓
Utilizing pythagoras theorem, the length of pipe will be
L=√(23⅓)²+700²
L=700.38878092417 cm
Rounded off, the length is approximately 700.39 cm
Answer:
mutiply
Step-by-step explanation: