1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
PilotLPTM [1.2K]
2 years ago
6

The average production cost for major movies is 57 million dollars and the standard deviation is 22 million dollars. Assume the

production cost distribution is normal. Suppose that 17 randomly selected major movies are researched. Answer the following questions. Give your answers in millions of dollars, not dollars. Round all answers to 4 decimal places where possible. What is the distribution of X ? X ~ N( , ) What is the distribution of ¯ x ? ¯ x ~ N( , ) For a single randomly selected movie, find the probability that this movie's production cost is between 55 and 58 million dollars. For the group of 17 movies, find the probability that the average production cost is between 55 and 58 million dollars. For part d), is the assumption of normal necessary? NoYes
Mathematics
1 answer:
Degger [83]2 years ago
8 0

Using the normal distribution, we have that:

  • The distribution of X is X \approx (57,22).
  • The distribution of \mathbf{\bar{X}} is \bar{X} \approx (57, 5.3358).
  • 0.0597 = 5.97% probability that a single movie production cost is between 55 and 58 million dollars.
  • 0.2233 = 22.33% probability that the average production cost of 17 movies is between 55 and 58 million dollars. Since the sample size is less than 30, assumption of normality is necessary.

<h3>Normal Probability Distribution</h3>

The z-score of a measure X of a normally distributed variable with mean \mu and standard deviation \sigma is given by:

Z = \frac{X - \mu}{\sigma}

  • The z-score measures how many standard deviations the measure is above or below the mean.
  • Looking at the z-score table, the p-value associated with this z-score is found, which is the percentile of X.
  • By the Central Limit Theorem, the sampling distribution of sample means of size n has standard deviation s = \frac{\sigma}{\sqrt{n}}.

In this problem, the parameters are given as follows:

\mu = 57, \sigma = 22, n = 17, s = \frac{22}{\sqrt{17}} = 5.3358

Hence:

  • The distribution of X is X \approx (57,22).
  • The distribution of \mathbf{\bar{X}} is \bar{X} \approx (57, 5.3358).

The probabilities are the <u>p-value of Z when X = 58 subtracted by the p-value of Z when X = 55</u>, hence, for a single movie:

X = 58:

Z = \frac{X - \mu}{\sigma}

Z = \frac{58 - 57}{22}

Z = 0.05.

Z = 0.05 has a p-value of 0.5199.

X = 55:

Z = \frac{X - \mu}{\sigma}

Z = \frac{55 - 57}{22}

Z = -0.1.

Z = -0.1 has a p-value of 0.4602.

0.5199 - 0.4602 = 0.0597 = 5.97% probability that a single movie production cost is between 55 and 58 million dollars.

For the sample of 17 movies, we have that:

X = 58:

Z = \frac{X - \mu}{s}

Z = \frac{58 - 57}{5.3358}

Z = 0.19.

Z = 0.19 has a p-value of 0.5753.

X = 55:

Z = \frac{X - \mu}{s}

Z = \frac{55 - 57}{5.3358}

Z = -0.38.

Z = -0.38 has a p-value of 0.3520.

0.5753 - 0.3520 = 0.2233 = 22.33% probability that the average production cost of 17 movies is between 55 and 58 million dollars. Since the sample size is less than 30, assumption of normality is necessary.

More can be learned about the normal distribution at brainly.com/question/4079902

#SPJ1

You might be interested in
A science test, which is worth 100 points, consists of 24 questions. Each question is worth either 3 points or 5 points. If x is
wel
X+y=24 so we can say

x=24-y making 3x+5y=100 become

3(24-y)+5y=100

72-3y+5y=100

72+2y=100

2y=28

y=14, since x=24-y

x=10

So there are 10 3-point questions and 14 5-point questions.
6 0
3 years ago
Read 2 more answers
45 centimeters is equivalent to how many inches?
Fiesta28 [93]

It is equivalent to 17.7165 inches.

5 0
3 years ago
Read 2 more answers
Let y = 2. Solve for t: y = 3t - 4<br> A.<br> B.<br> c.<br> D.<br> -2<br> -2/3<br> 2<br> 3
Pavel [41]

Answer:

a -    t = 2

Step-by-step explanation:

4 0
3 years ago
Read 2 more answers
Use the quadratic formula to solve the equation to the exact value or round to two decimal places.
lys-0071 [83]
First set everything to 0.
{x}^{2}  + x - 5
Giving you A= 1 , B= 1 and C= -5
Then input everything into the quadratic formula and either solve by hand or use a calculator.
Note exact values are found by hand, decimals are found using a calculator.

6 0
3 years ago
The path of a roller coaster after it has reached the top of the first hill follows a polynomial function as shown in the graph
Paraphin [41]
The interval that f(x) is increasing is the distance from 200 to 300.
The minimum value of f(x) in the interval 0<x<300 is 200.
At a value of 500, the value of f(x) is 0.
The function can't be a quadratic function since there are two points in the graph where f(x) changes its rate from increasing to decreasing or the opposite. A quadratic function has only one of that point.
5 0
3 years ago
Read 2 more answers
Other questions:
  • Pleaseeee help!!!! I will mark you as brainlinest for correct answer!!!!!
    7·2 answers
  • NEED HELP ASAP!!!! WILL GIVE 50+POINTS!!!! WILL MARK BRAINLIEST!!!! WILL FOLLOW!!!!
    9·1 answer
  • Help Please 100 point's + Brainly.est 8th grade Math Look at the photos below and answer them PLEASE
    15·2 answers
  • Help me pleaseeeeeee
    6·1 answer
  • DG¯¯¯¯¯¯ , EG¯¯¯¯¯ , and FG¯¯¯¯¯ are perpendicular bisectors of the sides of △ABC . DG=5 centimeters and BD=12 centimeters. What
    9·2 answers
  • What is the slope on this graph
    7·1 answer
  • True or False: You can have 2 right angles in a triangle.
    15·1 answer
  • At a real estate agency, an agent sold a house for $311,000. The commission rate is 4.6% for the real
    9·1 answer
  • PLS HELP plsssssssssssssssssssssss
    5·2 answers
  • 11 4/5 + 3 5/6 and you have to add
    7·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!