2.434 to 3 sigfigs = 2.43 .
Answer:
The rate is 1 ÷ 2 yards per hour
Step-by-step explanation:
The computation of the rate does the amount of yarn changes is given below:
= 3 3 ÷ 4 - 1 1 ÷8
= 15 ÷ 4 - 9 ÷ 8
= 21 ÷ 8 yards
Now divide the above fraction by the number of hours
= 21 ÷ 8 yards ÷ 5 1 ÷ 4
= 21 ÷ 8 × 4 ÷ 21
= 1 ÷ 2 yards per hour
Hence, the rate is 1 ÷ 2 yards per hour
The same would be relevant
Answer:
x+2
Step-by-step explanation:
we know that
To find out the factors of a polynomial, determine the x-intercepts or zeros of the polynomial
Remember that
The x-intercepts of a polynomial are the values of x when the value of the polynomial is equal to zero
In this problem
Looking at the graph
For x=-2, f(x)=0
so
x=-2 is an x-intercept or zero of the polynomial
To find out the factor move the constant to the left side and equate to zero

adds 2 both sides

therefore
The factor is (x+2)