Option D
Product Managers are expected to collaborate in planning the amount of upcoming Enabler work by establishing Completed epic acceptance criteria
<u>Explanation</u>:
Acceptance criteria are a formalized schedule of elements that assure that all user narratives are developed and complete synopses are carried into account. Acceptance Criteria are a collection of observations, respectively with a precise pass/fail outcome, that defines all specifications and are suitable at the Epic, Feature, and Story Level.
An epic is an excellent method to endure the trace of the huge idea in agile circumstances. It enhances crews split their job while proceeding to operate towards a larger intention.
Answer: raise; reduce
Explanation:
A Supply shock is described as a situation where the supply of a good changes suddenly/ abruptly due to an unforeseen event.
Supply shocks can be positive but are usually negative so we will assume the supply shock is negative here.
If there is a negative supply shock, the amount of goods being produced will reduce abruptly which will force the supply curve to shift left.
It will then intercept the the demand curve at an equilibrium level that has a higher price and a lower quantity of output.
Think of it this way. Negative supply shock ⇒ less goods ⇒ scarcity ⇒ higher prices.
Answer:
Its action would be optimal given an ordering cost of $28.31 per order
Explanation:
According to the given data we have the following:
economic order quantity, EOQ= 55 units
annual demand, D=235
holding cost per one unit per year, H=40%×$11=$4.4
ordering cost, S=?
In order to calculate the ordering cost we would have to use the following formula:
EOQ=√(<u>2×D×S)</u>
(H)
Hence, S=<u>(EOQ)∧2×H</u>
2×D
S=<u>(55)∧2×4.4</u>
2×235
S=<u>13,310</u>
470
S=$28.31
Its action would be optimal given an ordering cost of $28.31 per order
Answer:
Second National Bank
Present value (PV) = $5,400
Future value (FV) = $13,900
Interest rate (r) = 10% = 0.10
FV = PV(1 + r)n
$13,900 = $5,400(1 + 0.10)n
<u>$13,900</u> = (1.10)n
$5,400
2.574074074 = (1.10)n
Log 2.574074074 = n log 1.10
<u>Log 2.574074074</u> = n
Log 1.10
n = 9.9 years
None of the answers is correct
Explanation:
In this case, we will apply the formula of future value of a lump sum. The present value, interest rate and future value were provided with the exception of number of years. Thus, the number of years becomes the subject of the formula. The future value equals present value, multiplied by 1 plus interest rate, raised to power number of years.