Volume = 1/3 * area of base * height
=1/3 * 11^2 * 15
= 605 cm^3 Answer
Answer:
u just expand the brackets out and make a linear equation to solve from there
Step-by-step explanation:
Answer:
A =
- B
Step-by-step explanation:
Given
R = x(A + B) ← divide both sides by x
= A + B ( subtract B from both sides )
- B = A
Answer:
Sharika needs 2.5 days to finish the remaining work
Step-by-step explanation:
Sharika can do a work in 6 days palkey can do it in 8 days
Then the amount of work sharika can do in 1 day = 1/6
And the amount of work palkey can do in 1 day = 1/8
The amount of work both of them can do together in 1 day = 1/6 + 1/8
= 7/24
The amount of work both of them can do together in 2 day = (2× 7/24)
= 7/12
Since Palkey left the work,the amount of
work remaining for Sharika to do alone = (1 - 7/12 )
= 5/12
The number of days Sharika take to finish the remainig work. = (5/12 ÷ 1/6 )
= 5/2 days
Therefore, Sharika needs 2.5 days to finish the remaining work.
The question is saying that the line KJ is approximately equal to the line JN and that the line JN is perpendicular to the line NL. The line labeled LKN is shorter than LNK due to the fact that the line segments in LNK are longer because JN is perpendicular to NL:)