Answer: it will take 125 additional minutes for both costs to be equal.
Step-by-step explanation:
Let a represent the number of additional minutes that it will it take for the two to be the same.
Company A charges a flat fee of 59.99 a month and .43 additional minutes. This means that the total cost of a additional units would be
0.43x + 59.99
Company B charges 69.99 a month and .35 for additional minutes. This means that the total cost of a additional units would be
0.35x + 69.99
For the cost of the two plans to be the same, it means that
0.43x + 59.99 = 0.35x + 69.99
0.43x - 0.35x = 69.99 - 59.99
0.08x = 10
x = 125
For the answer to the question above,
The expected value in percentage format is 0.2 x 15+0.4 x 20 + 0.3 x 30 + 0.1*35 = <u><em>23.5%</em></u>
The answer is <u><em>23.5%
</em></u>
I hope my answer helped you. Have a nice day ahead!
<u><em /></u>
It's the same as finding the hypothenuse of a right triangle. Let c be the hypothenuse.
30 squared+ 50 squared= c squared.
900+ 2500= c squared
3400= c squared
Then find the square root of 3400 and that will equal c.
So, depending in what form the teacher was the answer. The answer will be square root of 3400 ft squared or 58.3 ft squared.
Answer:
Step-by-step explanation:
y = mx +b
Here , m is the slope and b is the y-intercept
y = (1/2)x - 3
y-intercept = -3