Answer:
a) 20.16; b) 20.49 and 21.51
Step-by-step explanation:
We use z scores for each of these. The formula for a z score is
.
For part a, we want the 20th percentile; this means we want 20% of the data to be lower than this. We find the value in the cells of the z table that are the closest to 0.20 as we can get; this is 0.2005, which corresponds with a z score of -0.84.
Using this, 21 as the mean and 1 as the standard deviation,
-0.84 = (X-21)/1
-0.84 = X-21
Add 21 to each side:
-0.84+21 = X-21+21
20.16 = X
For part b, we want the middle 39%. This means we want 39/2 = 19.5% above the mean and 19.5% below the mean; this means we want
50-19.5 = 30.5% = 0.305 and
50+19.5 = 69.5% = 0.695.
Looking these values up in the cells of the z table, we find those exact values; 0.305 corresponds with z = -0.51 and 0.695 corresponds with z = 0.51:
-0.51 = (X-21)/1
-0.51 = X-21
Add 21 to each side:
-0.51+21 = X-21+21
20.49 = X
0.51 = (X-21)/1
0.51 = X-21
Add 21 to each side:
0.51+21 = X-21+21
21.51 = X
I can't see the graph but let's use logic
hmm, more than 10 cubic feet of topsoil so the first and 2nd options are wrong
let's ee the costs
3rd option
10*1=10
2*12=24
10+24=34 and 34<50, that is fine
4th option
3*10=30
2*12=24
30+24=54
54>50, nope, that is over cost
answer is 3rd one
the one with 1 cubic yard compost and 12 cubic yard topsoil
Answer:
D
Step-by-step explanation:
Wait cam u explain ? 5 times 4/9 then you divide by 7