It takes 42 minutes for 6 people to paint 7 walls
<em><u>Solution:</u></em>
It takes 54 minutes for 4 people to paint 6 walls
To find: Minutes required for 6 people to paint 7 walls
If
men can do
work in
days working
hours per day and
men can do
work in
days working
hours per day, then

M = Number of men
D = Number of days
H = Number of hours per day
W = Amount of work
Here in this sum,
<em><u>54 minutes for 4 people to paint 6 walls</u></em>

<em><u>Minutes required for 6 people to paint 7 walls</u></em>

<em><u>Substituting the values in formula, we get</u></em>

Thus it takes 42 minutes for 6 people to paint 7 walls
Answer:
4(p−1)(p−3)
Step-by-step explanation:
Factor 4p2−16p+12
4p2−16p+12
=4(p−1)(p−3)
Answer:
Yolanda should have found the volume by multiplying 8 by 2/3.
Step-by-step explanation:
c i think because they dont specify
Answer:

Step-by-step explanation:
In this problem, we have:
H = 452 m is the height of the Petronas tower
h = 1.75 m is the height of the woman
d = 120 m is the distance between the woman and the base of the tower
First of all, we notice that we want to find the angle of elevation between the woman's hat the top of the tower; this means that we have consider the difference between the height of the tower and the height of the woman, so

Now we notice that
and
are the two sides of a right triangle, in which the angle of elevation is
. Therefore, we can write the following relationship:

since
H' represents the side of the triangle opposite to 
d represents the side of the triangle adjacent to 
Solving the equation for
, we find the angle of elevation:
