Answer:
= 47/46
Step-by-step explanation:
Given two points on a line, we use the following formula to find the slope
m = (y2-y1)/(x2-x1)
= (93- -1)/(91 - -1)
= (93+1)/(91 +1)
= 94/92
Divide the top and bottom by 2
= 47/46
Answer:
Sry its long but if your to lazy to look thru it here is the answer= z = {-7, 8}
Step-by-step explanation:
Simplifying
z2 + -1z + -56 = 0
Reorder the terms:
-56 + -1z + z2 = 0
Solving:
-56 + -1z + z2 = 0
Solving for variable 'z'.
Factor a trinomial.
(-7 + -1z)(8 + -1z) = 0
Subproblem 1
Set the factor '(-7 + -1z)' equal to zero and attempt to solve:
Simplifying:
-7 + -1z = 0
Solving:
-7 + -1z = 0
Move all terms containing z to the left, all other terms to the right.
Add '7' to each side of the equation.
-7 + 7 + -1z = 0 + 7
Combine like terms: -7 + 7 = 0
0 + -1z = 0 + 7
-1z = 0 + 7
Combine like terms: 0 + 7 = 7
-1z = 7
Divide each side by '-1'.
z = -7
Simplifying:
z = -7
Subproblem 2
Set the factor '(8 + -1z)' equal to zero and attempt to solve:
Simplifying:
8 + -1z = 0
Solving:
8 + -1z = 0
Move all terms containing z to the left, all other terms to the right.
Add '-8' to each side of the equation.
8 + -8 + -1z = 0 + -8
Combine like terms: 8 + -8 = 0
0 + -1z = 0 + -8
-1z = 0 + -8
Combine like terms: 0 + -8 = -8
-1z = -8
Divide each side by '-1'.
z = 8
Simplifying:
z = 8
Solution
z = {-7, 8}
Robin had 5/8 of a pound of butter when she was done baking. 1/4 = 2/8, and 7/8 - 2/8 = 5/8.
Answer:
95
Step-by-step explanation:
Use the mean formula: mean = sum of elements / number of elements
Plug in the mean and number of elements, then solve for the sum of the numbers:
mean = sum of elements / number of elements
19 = sum of elements / 5
95 = sum of elements
So, the sum of the numbers is 95.
88 % students of the class hand in their projects on time
<em><u>Solution:</u></em>
Given that, Ms.Khans class, 22 out of 25 students hand in their projects on time
Total number students = 25
Students hand in their projects on time = 22
<em><u>To find: percent of the class hand in their projects on time</u></em>

Substituting the values, we get

Thus 88 % students of the class hand in their projects on time