<span>A) 3x+4y=17
B) -4x-3y=-18 Multiplying B) by .75
</span><span>B) -3x -2.25y= -13.5 then adding this to A
</span><span><span>A) 3x + 4y = 17</span>
1.75y = 3.5
y = 2
</span><span>
A) 3x + 4*2 = 17</span>
3x + 8 = 17
3x = 9
x = 3
(3,2)
=1 I calculated the combine value
Answer:
x-7
Step-by-step explanation:
unknown number = x
Answer: a) 0.9544996
b) 0.9999366
Step-by-step explanation:
Given : The actual measured resistances of wires produced by company A have a normal probability distribution with mean
ohm and standard deviation
ohm.
Wires manufactured for use in a computer system are specified to have resistances between .12 and .14 ohms.
Let x be the random variable that represents the value of resistance in wires.
Using formula for z-score , 
The z-value at x= 0.12 will be

The z-value at x= 0.14 will be

The p-value : 

Hence, the probability that a randomly selected wire from company A’s production will meet the specifications = 0.9544996
b) Sample size : n= 4
Using formula for z-score , 
The z-value at x= 0.12 will be

The z-value at x= 0.14 will be

The p-value : 

The probability that all four in a randomly selected system will meet the specifications = 0.9999366
Answer:
f(-1)=8
f(3)=-4
Step-by-step explanation:
when x equals -1 you substitute -1 for x in the equation which would look like 5-3(-1) which you would then multiply -3 by -1 and get 3 which 5+3 would equal 8 so f(-1) equals 8
When x equals 3 you substitute 3 for x in the equation which would look like 5-3(3) which you would then multiply -3 by 3 which would give you 5-9 which equals -4 so f(3) equals -4