Answer:
probability of an electric power outage shipboard is 0.075 or 7.5 %
Step-by-step explanation:
Given the data in the question;
Probability of engine malfunction = 25% = 0.25
Probability of generator malfunction = 10% = 0.1
Probability of generator being repaired = 50% = 0.5
probability of an electric power outage shipboard = ?
To get the probability of an electric power outage shipboard, we use the expression;
probability of an electric power outage = 2
× p( Probability of generator malfunction ) × p( Probability of generator being repaired ) × ( 1 - p( Probability of engine malfunction ) )
so we substitute in our given values;
probability of an electric power outage = 2 × 0.1 × 0.5 × ( 1 - 0.25 )
probability of an electric power outage = 2 × 0.1 × 0.5 × 0.75
probability of an electric power outage = 0.075 or 7.5 %
The formula is y=mx+b
To get the slope or m, use this formula
(the second y minus the first y)/(the second x minus the first x)
Now set it up.
(10-7)/(2--1)
3/3=slope is 1.
y=1x+b
Insert one of the points for x and y.
i will do (-1,7)
7=1(-1)+b
7=-1+b
8=b
Insert this into the final equation:
y=1x+8
Try it out. If you're not sure, try both points. If it works, then you set it up correctly.
Answer:
5 and 2
Step-by-step explanation:
Degree is the highest power of the polynomial
A) 5000 m²
b) A(x) = x(200 -2x)
c) 0 < x < 100
Step-by-step explanation:
b) The remaining fence, after the two sides of length x are fenced, is 200-2x. That is the length of the side parallel to the building. The product of the lengths parallel and perpendicular to the building is the area of the playground:
A(x) = x(200 -2x)
__
a) A(50) = 50(200 -2·50) = 50·100 = 5000 . . . . m²
__
c) The equation makes no sense if either length (x or 200-2x) is negative, so a reasonable domain is (0, 100). For x=0 or x=100, the playground area is zero, so we're not concerned with those cases, either. Those endpoints could be included in the domain if you like.